COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Tillicum

USA · operational · ai training

Tillicum

Also known as UW Tillicum

Operated by University of Washington .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
8.85 PFlop/s
HPL measured
Rpeak
12.87 PFlop/s
Rmax ÷ Rpeak
68.8%
Cores
26,880
Power
144 kW
Per watt
61.5 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tillicum, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax8.85 PFlop/s#120 of 202 · bottom 42%#57 of 332 · top 17%
Energy efficiency61.5 GF/W#17 of 99 · top 16%#5 of 162 · top 2%
Rmax ÷ Rpeak68.8 %#125 of 199 · bottom 38%#209 of 331 · bottom 38%
Power draw144 kW#83 of 104 · bottom 21%#137 of 171 · bottom 21%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge XE9680
Dell Technologies - Reported top500.org
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
NVIDIA H200 SXM5 141GB
NVIDIA - Verified top500.orgdepts.washington.edu
CPU Intel Xeon Platinum 8462Y+
CPUs
x86-64 · 32C · 2.8 GHz · Intel 7
Intel Xeon Platinum 8462Y+ 32C 2.8GHz
Intel - Reported top500.org
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
Infiniband NDR
NVIDIA - Reported top500.org

Engineering, funding and access

What Tillicum runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyNVIDIA InfiniBand NDR2026-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackRocky Linux 9.6, NVCC 12.8, cuBLAS 12.8.3 and OpenMPI 4.1.7 for the TOP500 run2026-06Operator statedtop500.org

Access

ItemDetailAs ofBasisSource
How researchers get timeUW Seattle students paying the Student Technology Fee can apply to Research Computing for Tillicum computing credit grants worth USD 250, usable within six months of account access; applications take 5 to 7 business days2026Operator stateddepts.washington.edu
Access pagedepts.washington.edu/uwrcc/tillicum2026Operator stateddepts.washington.edu

The read

The University of Washington's GPU-accelerated research computing platform. TOP500 lists it as a Dell PowerEdge XE9680 system with Intel Xeon Platinum 8462Y+ CPUs and NVIDIA H200 SXM5 141GB GPUs on NDR InfiniBand: 26,880 cores, Rmax 8.85 PFlop/s, Rpeak 12.87 PFlop/s and 144 kW under Rocky Linux 9.6, 185th on the November 2025 list and 207th on June 2026. The UW research computing page confirms H200 GPUs with multi-GPU, multi-node support but gives no node count; the data-centre site is not stated in the pages fetched.

Timeline

  • 2025 First operational source
  • 2025-11 Listed at #185 on the TOP500 (November 2025) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to Tillicum by Rmax, smaller to larger.

  • Nanyang Titan · Singapore, operational · 8.8 PFlop/s
  • Raven-GPU · Germany, operational · 8.62 PFlop/s
  • Mira · USA, decommissioned · 8.59 PFlop/s
  • Dragão · Brazil, operational · 8.98 PFlop/s
  • Taiwania 2 · Taiwan, operational · 9 PFlop/s
  • Aitken · USA, operational · 9.07 PFlop/s

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
depts.washington.edunames system and partNVIDIA H200 SXM
top500.orgnames system and partNVIDIA H200 SXM, Intel Xeon Platinum 8462Y+, NVIDIA InfiniBand NDR (Quantum-2)

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading