Supercomputers/Systems/JUGENE
Germany · decommissioned · hpc
JUGENE
Operated by Forschungszentrum Julich at Julich Supercomputing Centre .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 190.90 TFlop/s
- Rpeak
- 222.82 TFlop/s
- Rmax ÷ Rpeak
- 85.7%
- Cores
- 65,536
- Power
- 504 kW
- Per watt
- 0.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of JUGENE, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 190.90 TFlop/s | #17 of 112 · top 14% | #75 of 95 · bottom 22% |
| Energy efficiency | 0.4 GF/W | #8 of 61 · top 12% | #62 of 68 · bottom 10% |
| Rmax ÷ Rpeak | 85.7 % | #20 of 112 · top 17% | #17 of 94 · top 17% |
| Power draw | 504 kW | #30 of 62 · top 48% | #32 of 69 · top 46% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM eServer Blue Gene Solution | IBM | - | Verified | top500.orgfz-juelich.de |
| CPU | IBM PowerPC 450 850MHz CPUs PowerPC · 4C · 0.85 GHz · 90 nm PowerPC 450 850MHz, 16,384 quad-core nodes (16-rack configuration) | IBM | 65,536 reported | Reported | top500.org |
| Interconnect | IBM BlueGene 3D torus Interconnect 3D torus, plus separate collective and barrier networks · 175 MB/s per link per direction IBM Blue Gene 3D torus, proprietary | IBM | - | Reported | top500.org |
| Operating system | IBM Compute Node Kernel Operating systems Microkernel, no dynamic scheduling · Proprietary CNK/SLES 9 | IBM | - | Reported | top500.org |
Engineering, funding and access
What JUGENE runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 32 TBOriginal 16-rack system of 65,536 PowerPC 450 cores; the 72-rack expansion of 2009 is not covered by this figure | 2008-02-22 | Operator stated | fz-juelich.de |
| Interconnect and topology | IBM Blue Gene/P proprietary network; FZJ's specification lists 5.1 GB/s local network bandwidth, 160 ns latency and 13.6 GB/s storage bandwidthFor the original 16-rack system | 2008-02-22 | Operator stated | fz-juelich.de |
| Cooling design | Water-cooled racks, 72 in the final configuration | 2012-07 | Operator stated | fz-juelich.deheise.de |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Gauss Centre for Supercomputing (federal government and the states of Baden-Wuerttemberg, Bavaria and North Rhine-Westphalia)The petaflop JUGENE was acquired within GCS, per FZJ's June 2009 release | 2009-06-23 | Operator stated | fz-juelich.de |
| Funded by | State of North Rhine-WestphaliaNamed with Forschungszentrum Julich and the Helmholtz Association as involved in acquiring the original 16-rack system | 2008-02-22 | Operator stated | fz-juelich.de |
| Funded by | Helmholtz AssociationInvolved in acquiring the original 16-rack system | 2008-02-22 | Operator stated | fz-juelich.de |
| Procurement | Contract with IBM signed on 25 June 2007 by FZJ board chairman Achim Bachem and IBM Germany CEO Martin Jetter for a 16-rack Blue Gene/P of about 65,000 processors due in autumn 2007 | 2007-06-25 | Operator stated | fz-juelich.de |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Computing time awarded to the best projects by an independent expert panel; users came through the Gauss Centre for Supercomputing, PRACE and Forschungszentrum Julich, with RWTH Aachen researchers via JARA | 2012-07 | Operator stated | fz-juelich.defz-juelich.de |
The read
Julich's original 16-rack IBM Blue Gene/P, second on the November 2007 TOP500 at 190.9 TFlop/s Rmax and Europe's fastest machine at the time. Julich's own farewell notice independently confirms the October 2007 installation and the rank-2 November 2007 result, and gives 31 July 2012 as the final shutdown date after the system had grown in place to 72 racks and 294,912 cores from mid-2009 as the first petaflop machine in Europe. That larger, later configuration is TOP500's separate JUGENE entry with its own rank history; this row's Rmax, Rpeak and core count are the original 16-rack machine's. JUQUEEN, its Blue Gene/Q successor, is not yet in this dataset. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 2007-06-25 Forschungszentrum Julich and IBM signed the contract for the 16-rack Blue Gene/P that became JUGENE source
- 2007-10 First operational source
- 2007-11 Listed at #2 on the TOP500 (November 2007) source
- 2008-02-22 Officially inaugurated by North Rhine-Westphalia Minister-President Juergen Ruettgers and BMBF State Secretary Thomas Rachel source
- 2009-06 Expanded to 72 water-cooled racks and 294,912 cores, with user operation of Europe's first petaflop system starting in June 2009 source
- 2009-06-23 The expanded JUGENE ranked third on the June 2009 TOP500 with more than 1 PFlop/s peak, the fastest computer in Europe source
- 2012-07-31 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Julich Supercomputing Centre
- Location
- Julich, Germany
- Cooling
- Direct liquid cooling
- Commissioned
- 2004
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Rmax and power at debut: 190.9 TFlop/s on the November 2007 list and 504 kW, as in the notes against 167.3 TFlop/s on that edition and 560 kW, per FZJ's 2008 release. 190.9 TFlop/s is TOP500's later headline figure for the system.
Change history
- 2026-09-24 Added; row reflects the original 16-rack configuration, its best-ranked TOP500 entry
Nearby in scale
The machines closest to JUGENE by Rmax, smaller to larger.
- Nemo (CERFACS) · France, operational · 0.19 PFlop/s
- OCuLUS (Paderborn) · Germany, decommissioned · 0.19 PFlop/s
- Carter (Purdue) · USA, decommissioned · 0.19 PFlop/s
- Shaheen · Saudi Arabia, decommissioned · 0.19 PFlop/s
- JAEA PRIMERGY BX900 · Japan, operational · 0.19 PFlop/s
- Galaxy · Australia, operational · 0.19 PFlop/s
Related systems
Same site
- JUBL · Germany, decommissioned, 2006
- JUROPA · Germany, decommissioned, 2009
- QPACE (Julich) · Germany, operational, 2009
- JUMP · Germany, operational, 2004
- JUQUEEN · Germany, decommissioned, 2012
- JURECA · Germany, decommissioned, 2015
Same operator
- Julich Cray T3E · Germany, decommissioned, 1996
- JUWELS Cluster · Germany, operational, 2018
- JURECA-DC · Germany, operational, 2020
- JUWELS Booster · Germany, operational, 2020
- JEDI · Germany, operational, 2024
- JETI · Germany, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| fz-juelich.de | names system and part | IBM Compute Node Kernel |
| top500.org | names system, part and count | IBM PowerPC 450 850MHz · counts: 65536 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.