Australia · planned · ai training

IREN Bundey Campus

Also known as IREN South Australia 800 MW campus

Operated by IREN .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
IREN develops the 800 MW Bundey campus
IREN - Reported pv-magazine-australia.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 800 MW 2026-06-04 Design target IREN: 800 MW campus supported by four 330 kV feeder exits; energization from 2028. pv-magazine-australia.comdatacenterknowledge.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Grid - 800 contracted 2026-06 Operator stated Transmission connection agreement for four 330 kV feeder exits at the utility substation, expected to support up to 800 MW without network upgrades; energization from 2028. pv-magazine-australia.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

IREN's first announced Australian campus, an 800 MW data centre campus at Bundey, South Australia about 78 miles north-east of Adelaide, announced on 4 June 2026 after IREN signed a transmission connection agreement for four 330 kV feeder exits expected to support up to 800 MW without network upgrades, with energization from 2028. IREN's release does not state GPU type, tenant or cooling, so no hardware is recorded; IREN is a vertically integrated AI cloud operator and a trade-press roundup (the second source) lists the same 800 MW figure. Status is planned.

Timeline

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
datacenterknowledge.comnames system only-
pv-magazine-australia.comnames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.