Supercomputers/Systems/KarolAIna
Czechia · planned · mixed
KarolAIna
Also known as Czech AI Factory supercomputer
Operated by IT4Innovations at IT4Innovations, Ostrava .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IT4Innovations hosts and operates the system, about 340 AI chips delivering up to 850 PFlop/s of AI performance | IT4Innovations | - | Reported | e-infra.czciirc.cvut.cz |
Engineering, funding and access
What KarolAIna runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | EuroHPC Joint Undertaking, half of the fundingTotal Czech AI Factory budget of nearly CZK 1 billion (about EUR 40 million), about half of it for procuring and operating KarolAIna | 2025-10 | Operator stated | e-infra.cz |
| Funded by | Czech Republic, co-financing the other half | 2025-10 | Operator stated | e-infra.cz |
| Funding programme | EuroHPC AI Factories call: the Czech AI Factory (CZAI), led by VSB-Technical University of Ostrava with Czech universities and research institutes | 2025-10 | Operator stated | e-infra.cz |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | EuroHPC JU uses 50 percent of computing time and related AI services; the rest serves industry, public administration, research teams and start-ups through the CZAI one-stop shop | 2025-10 | Operator stated | e-infra.cz |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 340 accelerators | 2026-10 | Operator stated | Approximately 340 AI chips per IT4Innovations and CIIRC CTU (one joint press release). Chip model not published. | e-infra.czciirc.cvut.cz |
The read
The AI-optimised supercomputer at the core of the Czech AI Factory (CZAI), hosted and operated by IT4Innovations beside the Karolina system. IT4Innovations and CIIRC CTU both state it will run on approximately 340 AI chips for up to 850 PFlop/s in AI operations, with about half of the roughly EUR 40 million project budget going to the machine and EuroHPC using 50 percent of its computing time. Vendor, chip model, power and delivery date are not published, so no hardware part edges are recorded and the 850 PFlop/s figure (an AI-precision peak) is deliberately not entered as a FLOPS value. The two pages derive from one joint CZAI press release. e-INFRA CZ announced the Czech AI Factory and its new AI supercomputer on 10 October 2025 (https://www.e-infra.cz/en/news/the-czech-republic-has-its-own-ai-factory-including-a-new-ai-supercomputer).
Timeline
- 2025-10 Announced source
Site & facility
IT4Innovations, Ostrava
- Location
- Ostrava, Czechia
- Cooling
- Direct liquid cooling
- Commissioned
- 2013
Change history
- 2026-11-08 Karolaina announcement date corrected
- 2026-10-07 Added KarolAIna (IT4Innovations)
Nearby in scale
The machines closest to KarolAIna by accelerator count, smaller to larger.
- HoreKa 2 · Germany, operational · 300 accelerators
- Quest (Northwestern) · USA, operational · 269 accelerators
- FASTER (Texas A&M) · USA, operational · 262 accelerators
- Gilbreth (Purdue) · USA, operational · 358 accelerators
- Athena · Poland, operational · 384 accelerators
- Mimer AI Factory · Sweden, under construction · 400 accelerators
Related systems
Same site
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| ciirc.cvut.cz | names system only | - |
| e-infra.cz | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.