Supercomputers/Systems/Lichtenberg II
Germany · operational · hpc
Lichtenberg II
Also known as Lichtenberg II Phase 1; Lichtenberg 2
Operated by TU Darmstadt at TU Darmstadt Lichtwiese Campus .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.15 PFlop/s
- Rpeak
- 4.35 PFlop/s
- Rmax ÷ Rpeak
- 72.4%
- Cores
- 59,136
- Power
- 690 kW
- Per watt
- 4.6 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Lichtenberg II, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.15 PFlop/s | #129 of 213 · bottom 41% | #35 of 95 · top 36% |
| Energy efficiency | 4.6 GF/W | #81 of 116 · bottom 31% | #33 of 68 · top 48% |
| Rmax ÷ Rpeak | 72.4 % | #77 of 209 · top 37% | #51 of 94 · bottom 47% |
| Power draw | 690 kW | #59 of 118 · top 50% | #26 of 69 · top 37% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - MEGWARE MiriQuid, 630 MPI nodes | MEGWARE | - | Reported | top500.orghrz.tu-darmstadt.de |
| CPU | - Two Intel Xeon Platinum 9242 48C (Cascade Lake) per MPI node | Intel | 630 reported | Reported | top500.orghrz.tu-darmstadt.de |
| Interconnect | - Mellanox InfiniBand HDR100 (100 Gbit/s) | NVIDIA | - | Reported | top500.orghrz.tu-darmstadt.de |
Engineering, funding and access
What Lichtenberg II runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 643 nodes630 MPI, 2 large-memory, 8 GPU and 3 DGX A100 nodes, excluding 8 login nodes; the page lists totals of 62,592 cores for the later configuration | 2026 | Operator stated | hrz.tu-darmstadt.de |
| Total memory | 257 TBTotal RAM for compute and login nodes; MPI nodes have 384 GB each | 2026 | Operator stated | hrz.tu-darmstadt.de |
| Interconnect and topology | InfiniBand HDR100 (100 Gbit/s) on login, MPI, MEM and GPU nodes; 2x HDR200 on DGX A100 nodes | 2026 | Operator stated | hrz.tu-darmstadt.de |
| Cooling design | Direct hot-water cooling with return temperatures above 45 degrees C | 2026 | Operator stated | hkhlr.de |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Federal government and the State of Hesse, splitting the 15 million euro investment equallyInvestment covers Lichtenberg II as a whole (stage 1 in mid-2020 with 643 nodes, stage 2 with 581 more nodes) | 2023 | Operator stated | hkhlr.detu-darmstadt.de |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Part of the NHR network, operated by the TU Darmstadt University Computing Center (HRZ) | 2026 | Operator stated | hkhlr.de |
The read
TU Darmstadt's Lichtenberg II first phase, a MEGWARE MiriQuid hot-water-cooled cluster whose 630 MPI nodes each carry two Xeon Platinum 9242 (48-core Cascade Lake) CPUs on InfiniBand HDR100, with additional V100/A100 GPU nodes and DGX A100 nodes in the later configuration. MEGWARE calls it the fastest university HPC system in Germany at its June 2020 debut (92nd on the TOP500) and notes waste heat feeds the Lichtwiese campus district heating. TOP500 lists 59,136 cores, Rmax 3.15 and Rpeak 4.35 PFlop/s at 690 kW, still listed in June 2026.
Timeline
- 2020 First operational source
- 2020-06 Listed at #92 on the TOP500 (June 2020) source
- 2023-07-11 TU Darmstadt officially inaugurates Lichtenberg II, adding a second stage of 581 Sapphire Rapids nodes to the 643-node first stage source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
TU Darmstadt Lichtwiese Campus
- Location
- Darmstadt, Germany
- Cooling
- Hot-water cooling with waste heat to district heating
- Commissioned
- 2020
Change history
- 2026-10-02 Added Lichtenberg II, TU Darmstadt's hot-water-cooled MEGWARE cluster, 92nd on the June 2020 TOP500
Nearby in scale
The machines closest to Lichtenberg II by Rmax, smaller to larger.
Related systems
Same site
- Lichtenberg II Phase 2 · Germany, operational, 2023
Same operator
- Lichtenberg I Phase 2 · Germany, operational, 2014
- Lichtenberg I · Germany, decommissioned, 2013
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system only | - |
| hrz.tu-darmstadt.de | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.