Supercomputers/Systems/TCS HyperVault Hyderabad Campus
India · planned · ai training
TCS HyperVault Hyderabad Campus
Also known as HyperVault Hyderabad 1 GW AI campus
Operated by TCS HyperVault at HyperVault Hyderabad Campus Site .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - TCS HyperVault develops the 1 GW AI campus | TCS HyperVault | - | Reported | aiweekly.cothenewsminute.com |
| Cooling | - Direct-to-chip liquid cooling with racks above 170 kW | TCS HyperVault | - | Reported | thenewsminute.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 7.4 USD bn | 2026-09-05 | Operator stated | Up to 70,000 crore rupees committed by HyperVault and partners, about 7.4 billion dollars per AiWeekly. | aiweekly.cothenewsminute.com |
| Facility power | 1,000 MW | 2026-09-05 | Design target | 1 GW campus; scope (IT or facility) not stated. | aiweekly.cothenewsminute.com |
| Rack power | 170 kW | 2026-09-05 | Design target | High-density GPU systems supporting rack densities above 170 kW; a floor. | thenewsminute.com |
The read
A 1 GW, liquid-cooled AI data center campus on 264 acres in Bharat Future City, Hyderabad, announced by TCS HyperVault on 5 September 2026 with up to 70,000 crore rupees (about 7.4 billion dollars) of investment with partners, rack densities above 170 kW, a green-power and water-neutral design, and construction targeted to finish in early 2027 in the AiWeekly summary. Separately, OpenAI announced on 19 February 2026 that it will be the first customer of the HyperVault business at 100 MW with an option to scale to 1 GW; neither page ties that 100 MW to this campus, so it is not recorded as a claim here. No accelerator type or count is stated.
Timeline
- 2026-09-05 Announced source
Site & facility
HyperVault Hyderabad Campus Site
- Location
- Hyderabad (Bharat Future City), India
- Cooling
- Direct-to-chip liquid cooling
Change history
- 2026-10-09 Added TCS HyperVault Hyderabad Campus
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| aiweekly.co | names system only | - |
| thenewsminute.com | names system only | - |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.