COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Lux (ORNL)

USA · planned · ai training

Lux (ORNL)

Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE ProLiant Compute XD685
Hewlett Packard Enterprise - Reported ornl.gov

Engineering, funding and access

What Lux (ORNL) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes500 nodesOLCF lists 500+ nodes and 4,000+ MI355X GPUs; some nodes run persistent services, so full-system jobs may use fewer than 4,000 GPUs.2026-07Operator statedolcf.ornl.gov
Total memory1,100 TBAbout 1.1 PB of HBM3E in total (288 GB per GPU); this is GPU memory only.2026-07Operator statedolcf.ornl.gov
Storage capacity600 PBAccess to the Orion Lustre file system (over 600 PB) shared with Frontier, plus over 24 TB of local NVMe per node.2026-07Operator statedolcf.ornl.gov
Interconnect and topologyUltra Ethernet with a 400G NIC per GPUORNL's October 2025 release names AMD Pensando networking without fabric details.2026-07Operator statedolcf.ornl.govornl.gov

Software

ItemDetailAs ofBasisSource
Parallel filesystemOrion Lustre file system (over 600 PB), shared with Frontier so data written there can be used for training on Lux2026-07Operator statedolcf.ornl.gov
Job schedulerSlurm and Kubernetes, with partition sizes adjusted to demand2026-07Operator statedolcf.ornl.gov

Funding

ItemDetailAs ofBasisSource
Funded byUS Department of Energy, with AMD co-investingORNL describes the cluster as built with AMD, HPE and Oracle Cloud Infrastructure.2026-07Operator statedolcf.ornl.govornl.gov
ProcurementAnnounced 27 October 2025 as a DOE partnership with AMD, HPE and Oracle Cloud Infrastructure, on HPE ProLiant Compute XD685 servers2025-10Operator statedornl.govolcf.ornl.gov

Access

ItemDetailAs ofBasisSource
How researchers get timePartners buy node-hours (minimum 175K node-hours per six-month period) at the DOE User Facility rate, with half of 3.5 million annual node-hours reserved for the Genesis Mission; applicants contact OLCF by email2026-07Operator statedolcf.ornl.gov
Access pagewww.olcf.ornl.gov/olcf-resources/compute-systems/lux2026-07Operator statedolcf.ornl.gov

The read

ORNL's AI cluster, announced in October 2025 for deployment in 2026 on HPE ProLiant XD685 servers with AMD Instinct MI355X GPUs, EPYC CPUs and Pensando networking. We found no source showing it has gone live, so it stays planned. Counts, power and FLOPS are not published, and ORNL is the only source.

Timeline

  • 2025-10 Announced source
  • 2026-07-17 OLCF installation photos show Lux being integrated at ORNL. source

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993

Change history

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.

Cited sourceResultFound on the page
ornl.govdoes not name this system-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • ORNL, AMD and HPE announce Discovery and Lux as Frontier's AI-era successors · Oak Ridge Leadership Computing Facility
    Lux runs AMD Instinct MI355X on HPE nodes with Oracle Cloud Infrastructure integration and arrives first, in 2026; Discovery follows in 2028 on MI430X and is billed as beating Frontier on every part of the system, not just peak flops. This keeps ORNL's AMD based lineage going a full hardware generation past the MI300A in El Capitan and the MI250X in Frontier.

All news →

Further reading