Supercomputers/Systems/SEIRAN
Japan · operational · ai training
SEIRAN
Also known as Tokyo University of Technology SEIRAN
Operated by Tokyo University of Technology at Tokyo University of Technology Hachioji Campus .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.32 PFlop/s
- Rpeak
- 3.66 PFlop/s
- Rmax ÷ Rpeak
- 90.7%
- Cores
- 15,552
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of SEIRAN, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.32 PFlop/s | #178 of 202 · bottom 13% | #44 of 131 · top 33% |
| Rmax ÷ Rpeak | 90.7 % | #14 of 199 · top 7% | #19 of 130 · top 14% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - NVIDIA DGX B200 (DGX BasePOD) | NVIDIA | - | Verified | top500.orgteu.ac.jp |
| Accelerator | NVIDIA B200 SXM Accelerators CUDA (Blackwell) · TSMC 4NP · 1,000 W 12 DGX B200 nodes, 96 NVIDIA B200 GPUs | NVIDIA | 96 reported | Verified | aitc.teu.ac.jptop500.org |
| CPU | Intel Xeon Platinum 8570 CPUs x86-64 · 56C · 2.1 GHz · Intel 7 Intel Xeon Platinum 8570 56C 2.1GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR (NVIDIA Quantum InfiniBand) | NVIDIA | - | Reported | top500.orgteu.ac.jp |
Engineering, funding and access
What SEIRAN runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 12 nodesNVIDIA DGX B200 systems, 96 Blackwell GPUs in total | 2025-06 | Operator stated | digitalpr.jpteu.ac.jp |
| Interconnect and topology | NVIDIA Quantum InfiniBand, built on the NVIDIA DGX BasePOD reference architecture | 2025-06 | Operator stated | digitalpr.jp |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | NVIDIA AI Enterprise | 2025-06 | Operator stated | digitalpr.jp |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Installed in the university AI Core Base (TUT AI CORE BASE); planned use includes student training and a secure in-house LLM, open to students and working adults alikeNo application procedure is described | 2025-06 | Operator stated | digitalpr.jp |
The read
The AI supercomputer of the AI Technology Center at Tokyo University of Technology on the Hachioji campus: 12 NVIDIA DGX B200 nodes (96 Blackwell GPUs) on NVIDIA Quantum InfiniBand, built on the DGX BasePOD reference architecture, with about 0.9 EFLOPS of FP8 AI performance. The university announced the installation on 11 June 2025 and described itself as the first private university in Japan to adopt the DGX B200. TOP500 lists 15,552 cores (Xeon Platinum 8570), Rmax 3.32 PFlop/s and Rpeak 3.66 PFlop/s under Ubuntu 24.04; it entered at 374th on the November 2025 list and was 398th on June 2026. The university's announcement scheduled operations to begin in October 2025.
Timeline
- 2025-06-11 Announced source
- 2025-10 First operational source
- 2025-11 Listed at #374 on the TOP500 (November 2025) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added SEIRAN, Tokyo University of Technology's DGX B200 system, 374th on the November 2025 TOP500
Nearby in scale
The machines closest to SEIRAN by Rmax, smaller to larger.
- Topaz (ERDC) · USA, operational · 3.32 PFlop/s
- Facebook DGX-1 Cluster · USA, operational · 3.31 PFlop/s
- Topaze · France, operational · 3.26 PFlop/s
- ASPIRE 2A (GPU Partition) · Singapore, operational · 3.33 PFlop/s
- SEAS H100 (Harvard) · USA, operational · 3.38 PFlop/s
- Tenaya · USA, operational · 3.41 PFlop/s
Related systems
Same accelerator
- AICR · USA, operational
- Betty · USA, operational, 2025
- CHIE-4 · Japan, operational, 2025
- Data Section Osaka B200 Supercluster · Japan, planned
- Equinox · USA, planned
- Haein Cluster · South Korea, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system, part and count | NVIDIA B200 SXM, Intel Xeon Platinum 8570, NVIDIA InfiniBand NDR (Quantum-2) · counts: 96 |
| teu.ac.jp | does not name this system | NVIDIA B200 SXM, NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.