Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 239.90 TFlop/s
- Rpeak
- 332.66 TFlop/s
- Rmax ÷ Rpeak
- 72.1%
- Cores
- 4,864
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Wilkes, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 239.90 TFlop/s | #166 of 227 · bottom 28% | #29 of 44 · bottom 36% |
| Rmax ÷ Rpeak | 72.1 % | #160 of 226 · bottom 30% | #26 of 44 · bottom 43% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell T620 cluster | Dell Technologies | - | Reported | top500.org |
| Accelerator | - NVIDIA Tesla K20c GPUs, 256 across 128 nodes | NVIDIA | 256 reported | Reported | top500.orgcsd3.cam.ac.uk |
| CPU | - Intel Xeon E5-2630v2 6C 2.6 GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond Infiniband FDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Wilkes runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 128 nodesDell T620 servers carrying 256 NVIDIA K20 GPUs | 2013 | Operator stated | csd3.cam.ac.ukcampustechnology.com |
| Interconnect and topology | Mellanox FDR InfiniBand, dual-rail, with 256 Connect-IB adaptersCampus Technology gives 100 Gb/s per adapter and 137 million messages per second; a 2014 Cambridge DAMTP talk confirms 256 Connect-IB cards | 2013-12 | Press report | campustechnology.comindico.ph.ed.ac.uk |
| Cooling design | Air-cooled; housed in a data centre using evaporative air coolers and water heat exchangers | 2013-12-19 | Operator stated | eng.cam.ac.uk |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Science and Technology Facilities Council (STFC), part-funderCampus Technology says the STFC funding was to drive Square Kilometre Array computing development in the SKA Open Architecture Lab | 2013-12-19 | Operator stated | eng.cam.ac.ukcampustechnology.com |
| Funded by | Rolls-Royce, part-funder | 2013-12-19 | Operator stated | eng.cam.ac.uk |
| Funded by | Mitsubishi Heavy Industries, part-funder | 2013-12-19 | Operator stated | eng.cam.ac.uk |
| Funding programme | SKA Open Architecture Lab: STFC part-funding to develop the Square Kilometre Array computing platform, with Wilkes as a test bedCambridge says it leads the design of the SKA computational platform and that Wilkes is a test bed for it | 2013-12 | Press report | campustechnology.comeng.cam.ac.uk |
| Procurement | Designed and built by the in-house engineering team of the Cambridge High Performance Computing Service in partnership with Dell, NVIDIA and Mellanox | 2013-12-19 | Operator stated | eng.cam.ac.uk |
The read
University of Cambridge's GPU cluster of 128 Dell T620 nodes with 256 NVIDIA K20c Tesla GPUs and Intel Ivy Bridge Xeon E5-2630v2 CPUs on InfiniBand FDR. Cambridge records it as second on the Green500 and the most energy-efficient air-cooled cluster in the world. TOP500 lists it 167th on the November 2013 list with 239.9 TFlop/s Rmax and 4,864 cores.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Wilkes, Cambridge's K20 GPU cluster
Nearby in scale
The machines closest to Wilkes by Rmax, smaller to larger.
- Euler I-II · Switzerland, decommissioned · 0.24 PFlop/s
- Lindgren · Sweden, decommissioned · 0.24 PFlop/s
- P&G Apollo 6000 Cluster · USA, operational · 0.23 PFlop/s
- Amazon EC2 Cluster Compute Instances · USA, operational · 0.24 PFlop/s
- Cooley · USA, operational · 0.24 PFlop/s
- Airbus HP PODs · France, operational · 0.24 PFlop/s
Related systems
Same operator
- Darwin III · United Kingdom, decommissioned, 2012
- Peta4 · United Kingdom, upgraded, 2017
- Wilkes-2 · United Kingdom, decommissioned, 2017
- Cumulus (Cambridge) · United Kingdom, operational, 2018
- Cumulus Cascade Lake · United Kingdom, operational, 2020
- Wilkes-3 · United Kingdom, operational, 2021
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| csd3.cam.ac.uk | names system only | - |
| top500.org | names system and part | Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.