Supercomputers/Systems/Blue Lion

Germany · planned · mixed

Blue Lion

Operated by LRZ at Leibniz Supercomputing Centre, Garching .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray Supercomputing GX5000
Hewlett Packard Enterprise - Reported lrz.deblogs.nvidia.com
Accelerator NVIDIA Vera Rubin
Accelerators
NVIDIA Vera Rubin
NVIDIA - Reported lrz.deblogs.nvidia.com
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
100% fanless direct liquid cooling
Hewlett Packard Enterprise - Reported blogs.nvidia.com

Engineering, funding and access

What Blue Lion runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyHPE Slingshot, 400 Gbit/s between compute and storage units2025-01-29Operator statedlrz.de
Cooling design100 percent fanless direct liquid cooling with water at up to 40 C in copper pipes; waste heat to heat LRZ offices and possibly neighbouring organisationsFanless design per LRZ's June 2025 item; NVIDIA's blog says rack heat will warm nearby buildings2025-06-11Operator statedlrz.delrz.de

Software

ItemDetailAs ofBasisSource
Programming and software stackHPE Performance Cluster Management and HPE Cray Programming Environment2025-01-29Operator statedlrz.de

Funding

ItemDetailAs ofBasisSource
Funded byFederal Ministry of Education and Research (BMBF)Shares the 250 million euro total cost, which includes operation until 2032, with the Bavarian science ministry2025-01-29Operator statedlrz.de
Funded byBavarian State Ministry of Science and the Arts (StMWK)2025-01-29Operator statedlrz.de
Funding programmePart of the Gauss Centre for Supercomputing national HPC infrastructure; total cost 250 million euros including operating costs until 20322025-01-29Operator statedlrz.de
ProcurementLRZ signed contracts with HPE on 13 December 2024 for next-generation HPE Cray technology with NVIDIA accelerators and processors; the NVIDIA Vera Rubin architecture was named in June 20252025-06-11Operator statedlrz.delrz.de

Access

ItemDetailAs ofBasisSource
How researchers get timeOutstanding national science projects through the Gauss Centre for Supercomputing, plus research in Bavaria; the allocation process is not yet described by LRZ2025-01-29Operator statedlrz.de

The read

LRZ's planned system, announced in June 2025 for 2027: an HPE Cray GX5000 with NVIDIA Vera Rubin and fanless direct liquid cooling with heat reuse, roughly 30 times SuperMUC-NG's performance, on a 250 million euro budget co-financed by the federal and Bavarian governments. NVIDIA's blog is its own account of the same announcement, so the tier is reported. Counts, power and FLOPS are not published. LRZ announced Blue Lion on 29 January 2025 (https://www.lrz.de/en/news/detail/2024-12-13-bluelion-en), saying the contracts with HPE were signed on 13 December 2024.

Timeline

  • 2024-12-13 LRZ signed contracts with HPE to build Blue Lion, scheduled to go live in early 2027 source
  • 2025-01 Announced source

Site & facility

Leibniz Supercomputing Centre, Garching

Location
Garching, Germany
Cooling
Direct warm-water cooling
Commissioned
2006

Change history

Same site

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
blogs.nvidia.comnames system and partNVIDIA Vera Rubin, Direct liquid cooling, warm water
lrz.denames system and partNVIDIA Vera Rubin, Direct liquid cooling, warm water

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.