Supercomputers/Systems/Blue Lion
Germany · planned · mixed
Blue Lion
Operated by LRZ at Leibniz Supercomputing Centre, Garching .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray Supercomputing GX5000 | Hewlett Packard Enterprise | - | Reported | lrz.deblogs.nvidia.com |
| Accelerator | NVIDIA Vera Rubin Accelerators NVIDIA Vera Rubin | NVIDIA | - | Reported | lrz.deblogs.nvidia.com |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid 100% fanless direct liquid cooling | Hewlett Packard Enterprise | - | Reported | blogs.nvidia.com |
Engineering, funding and access
What Blue Lion runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | HPE Slingshot, 400 Gbit/s between compute and storage units | 2025-01-29 | Operator stated | lrz.de |
| Cooling design | 100 percent fanless direct liquid cooling with water at up to 40 C in copper pipes; waste heat to heat LRZ offices and possibly neighbouring organisationsFanless design per LRZ's June 2025 item; NVIDIA's blog says rack heat will warm nearby buildings | 2025-06-11 | Operator stated | lrz.delrz.de |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | HPE Performance Cluster Management and HPE Cray Programming Environment | 2025-01-29 | Operator stated | lrz.de |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Federal Ministry of Education and Research (BMBF)Shares the 250 million euro total cost, which includes operation until 2032, with the Bavarian science ministry | 2025-01-29 | Operator stated | lrz.de |
| Funded by | Bavarian State Ministry of Science and the Arts (StMWK) | 2025-01-29 | Operator stated | lrz.de |
| Funding programme | Part of the Gauss Centre for Supercomputing national HPC infrastructure; total cost 250 million euros including operating costs until 2032 | 2025-01-29 | Operator stated | lrz.de |
| Procurement | LRZ signed contracts with HPE on 13 December 2024 for next-generation HPE Cray technology with NVIDIA accelerators and processors; the NVIDIA Vera Rubin architecture was named in June 2025 | 2025-06-11 | Operator stated | lrz.delrz.de |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Outstanding national science projects through the Gauss Centre for Supercomputing, plus research in Bavaria; the allocation process is not yet described by LRZ | 2025-01-29 | Operator stated | lrz.de |
The read
LRZ's planned system, announced in June 2025 for 2027: an HPE Cray GX5000 with NVIDIA Vera Rubin and fanless direct liquid cooling with heat reuse, roughly 30 times SuperMUC-NG's performance, on a 250 million euro budget co-financed by the federal and Bavarian governments. NVIDIA's blog is its own account of the same announcement, so the tier is reported. Counts, power and FLOPS are not published. LRZ announced Blue Lion on 29 January 2025 (https://www.lrz.de/en/news/detail/2024-12-13-bluelion-en), saying the contracts with HPE were signed on 13 December 2024.
Timeline
Site & facility
Leibniz Supercomputing Centre, Garching
- Location
- Garching, Germany
- Cooling
- Direct warm-water cooling
- Commissioned
- 2006
Change history
- 2026-11-08 Blue Lion announcement date corrected
- 2026-09-20 Planned system added
Related systems
Same site
- CoolMUC-4 · Germany, operational, 2024
- LRZ Cerebras CS-2 · Germany, operational, 2022
- SuperMUC-NG · Germany, operational, 2018
- CoolMUC-3 · Germany, decommissioned, 2017
- CoolMUC-2 · Germany, decommissioned, 2015
- SuperMUC Phase 2 · Germany, decommissioned, 2015
Same operator
- SuperMUC · Germany, decommissioned, 2012
- HLRB-II · Germany, decommissioned, 2007
- HLRB SR8000-F1 · Germany, decommissioned, 2000
- SuperMUC-NG Phase 2 · Germany, operational
Same accelerator
- Doudna · USA, planned
- Microsoft Azure AI datacenter (Narvik, Norway) · Norway, under construction
- Mission (LANL) · USA, planned
- Vision (LANL) · USA, planned
- Bitdeer AI Johor (A201) · Malaysia, under construction
- BMS AI Factory · USA, planned
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| blogs.nvidia.com | names system and part | NVIDIA Vera Rubin, Direct liquid cooling, warm water |
| lrz.de | names system and part | NVIDIA Vera Rubin, Direct liquid cooling, warm water |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Power and cooling
Why air ran out at 20 kW a rack, how warm-water cooling removes the chillers, and what PUE conceals.