COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/YTL AI Cloud (Kulai)

Malaysia · operational · mixed

YTL AI Cloud (Kulai)

Also known as YTL AI Cloud

Operated by YTL Power International at YTL Green Data Center Park .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
YTL Power International builds and operates the YTL AI Cloud at the YTL Green Data Center Park in Kulai
YTL Power International
- Reported technode.global
Accelerator NVIDIA GB200 NVL72
Accelerators
Arm CPU + CUDA GPU · TSMC 4NP
Liquid-cooled NVL72 Grace Blackwell GB200 systems; GPU count not stated
NVIDIA - Reported thestar.com.myfreemalaysiatoday.com

The read

Malaysia's first NVIDIA-powered AI data centre, completed on 31 October 2025 at YTL Power's 600 MW YTL Green Data Center Park in Kulai, Johor under a RM10 billion YTL and NVIDIA partnership signed in July 2025. The Star and Free Malaysia Today both name liquid-cooled NVL72 Grace Blackwell GB200 systems, hosting the YTL AI Cloud and the sovereign ILMU model; neither gives a GPU count or the facility's own power draw, and 600 MW is the park capacity. Both are news outlets reporting the announcement, so the tier is reported.

Timeline

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
freemalaysiatoday.comnames system and partNVIDIA GB200 NVL72
thestar.com.myblocked our fetch-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading