Supercomputers/Systems/Naver B200 4K Cluster

South Korea · operational · ai training

Naver B200 4K Cluster

Operated by Naver .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Naver combined its in-house cooling, power-distribution and network-optimization technologies to build the cluster
Naver
- Reported koreatimes.co.kr
Accelerator NVIDIA B200 SXM
Accelerators
CUDA (Blackwell) · TSMC 4NP · 1,000 W
4,000 Nvidia B200 GPUs
NVIDIA 4,000
reported
Reported koreatimes.co.krkoreatechtoday.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 4,000 accelerators 2026-01 Operator stated Naver reportedly completed a 4,000 B200 cluster in a leased Seoul facility (Jan 2026 press report). koreatechtoday.com

The read

Naver completed and announced a cluster of 4,000 Nvidia B200 GPUs on 8 January 2026 (Korea Times; a second outlet dates the report one day later), described as the largest of its kind in South Korea and built with Naver's in-house cooling, power-distribution and network optimization. Naver said a 72-billion-parameter model that took about 18 months on its earlier 2,048-GPU A100 infrastructure could be trained in roughly six weeks on the new cluster, and that its aggregate performance is comparable to high-ranking TOP500 systems; both are company claims and no HPL result is published. The two outlets disagree on siting (one says a leased Seoul facility, the other gives no location), so the site is left unlocated. Intended for Naver's next-generation Omni (text, image, video, audio) models.

Timeline

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
koreatechtoday.comnames system, part and countNVIDIA B200 SXM · counts: 4000
koreatimes.co.krnames system, part and countNVIDIA B200 SXM · counts: 4000