Companies/C-DAC
Pune, India
C-DAC
India's premier R&D organisation under the Ministry of Electronics and Information Technology (MeitY); operates the National PARAM Supercomputing Facility at Pune, including PARAM Siddhi-AI and AIRAWAT, under the National Supercomputing Mission.
Systems this company appears in
- Systems
- 15
- Aggregate Rmax
- 11.90 PFlop/s
- Aggregate power
- 209.95 kW
- First appearance
- 2013-02
- Most recent
- 2026
- Concentration
- 59%
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 14 | 11.51 PFlop/s |
| Interconnect | 1 | 388.44 TFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| PARAM Rudra-103 India · 2026 | Integrator | C-DAC | 4.48 PFlop/s | unranked |
| PARAM Rudra-104 India · 2026 | Integrator | C-DAC | 7.03 PFlop/s | unranked |
| PARAM Rudra (IUAC) India · 2024-09 | Integrator | C-DAC | - | unranked |
| PARAM Rudra (GMRT) India · 2024-09 | Integrator | C-DAC | - | unranked |
| PARAM Rudra (S. N. Bose) India · 2024-09 | Integrator | C-DAC | - | unranked |
| PARAM Ananta India · 2022-05-30 | Integrator | C-DAC | - | unranked |
| PARAM Ganga India · 2022-03 | Integrator | C-DAC | - | unranked |
| PARAM Pravega India · 2022-02-03 | Integrator | C-DAC | - | unranked |
| PARAM Ishan India · 2016-09 | Integrator | C-DAC | - | unranked |
| PARAM Yuva II India · 2013-02 | Interconnect | C-DAC | 388.44 TFlop/s | #70 June 2013 → |
| PARAM Shakti India · | Integrator | C-DAC | - | unranked |
| PARAM Sanganak India · | Integrator | C-DAC | - | unranked |
| PARAM Himalaya India · | Integrator | C-DAC | - | unranked |
| PARAM Yukti India · | Integrator | C-DAC | - | unranked |
| PARAM Rudra (IIT Bombay) India · | Integrator | C-DAC | - | unranked |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| PARAM Siddhi-AI | operational | - | - |
| AIRAWAT-PSAI | operational | - | - |
Figures come from the AI datacenter metrics; blank means none recorded.
Quantum computers operated
- Rigetti 108-Qubit System at C-DAC (Superconducting, planned, 108 qubits)
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| C-DAC (Pashan, Pune) | Pune, India | - | 2020 |
| C-DAC Bengaluru | Bengaluru, India | - | - |
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Power and cooling
The substation, the heat rejection plant, and the constraint that actually binds.