COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/ABCI 2.0

Japan · operational · ai training

ABCI 2.0

Also known as AIST ABCI 2.0 expansion

Operated by AIST at ABCI Data Center, Kashiwa .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
22.21 PFlop/s
HPL measured
Rpeak
54.34 PFlop/s
Rmax ÷ Rpeak
40.9%
Cores
504,000
Power
1.60 MW
Per watt
13.9 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Fujitsu PRIMERGY GX2570 M6 (Compute Node A) and PRIMERGY CX2570 M4 (Compute Node V) servers
Fujitsu - Reported abci.aitop500.org
Accelerator NVIDIA A100 SXM4 40GB
Accelerators
CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W
120 Compute Node (A), each with eight NVIDIA A100 for NVLink 40GiB HBM2
NVIDIA 960
reported
Reported abci.aitop500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
1,088 Compute Node (V), each with four NVIDIA Tesla V100 SXM2 16GiB
NVIDIA 4,352
reported
Reported abci.ai
CPU -
Two Intel Xeon Platinum 8360Y (36 cores, 2.4 GHz) per Compute Node (A) across 120 nodes
Intel 240
estimated
Reported abci.aitop500.org
CPU Intel Xeon Gold 6148
CPUs
x86-64 · 20C · 2.4 GHz · 14 nm · 150 W
Two Intel Xeon Gold 6148 (20 cores, 2.4 GHz) per Compute Node (V) across 1,088 nodes
Intel 2,176
estimated
Reported abci.aitop500.org
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Four InfiniBand HDR (200 Gbps) links per Compute Node (A)
NVIDIA - Reported abci.aitop500.org
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
Two InfiniBand EDR (100 Gbps) links per Compute Node (V)
NVIDIA - Reported abci.aitop500.org

The read

AIST's 2021 expansion of the ABCI AI facility, listed by TOP500 as ABCI 2.0. AIST's ABCI 2.0 page describes 120 Compute Node (A) Fujitsu PRIMERGY GX2570 M6 servers, each with two Xeon Platinum 8360Y CPUs and eight NVIDIA A100 40GB GPUs on four HDR InfiniBand links (960 A100 in total), plus 1,088 Compute Node (V) PRIMERGY CX2570 M4 servers with two Xeon Gold 6148 CPUs and four Tesla V100 SXM2 GPUs each on dual EDR links (4,352 V100); the V nodes are the 2018 ABCI hardware recorded in the abci row. Storage is a Lustre shared file system of about 34 PB and an S3-compatible object store with 17 PB physical capacity. TOP500 lists the entry as Fujitsu with 504,000 cores, Rmax 22.21 and Rpeak 54.34 PFlop/s, 1,600.32 kW (524.40 kW in an optimized run that reached 11.48 PFlop/s) and an installation year of 2021; its title names the A100 GX2570 M6 nodes while its processor field gives Xeon Gold 6148, so the entry appears to cover both node types, and AIST publishes no combined LINPACK figure to cross-check. It ranked 12th in June 2021, its best position, and was last listed in June 2024 at 39th, which is why status is held at that date. abci-3 (ABCI 3.0, H200) is the later generation and abci.ai says the service moved to version 3.0 in January 2025; AIST gives no separate end date for ABCI 2.0.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

ABCI Data Center, Kashiwa

Location
Kashiwa, Japan
Cooling
Direct liquid cooling with hot-water loop
PUE
1.1
Commissioned
2018

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
abci.ainames system, part and countNVIDIA A100 SXM4 40GB, NVIDIA Tesla V100, Intel Xeon Gold 6148, NVIDIA InfiniBand HDR, Mellanox InfiniBand EDR · counts: 960, 4352
top500.orgnames system and partNVIDIA A100 SXM4 40GB, Intel Xeon Gold 6148, NVIDIA InfiniBand HDR, Mellanox InfiniBand EDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading