COMPUTE ATLAS Supercomputer supply-chain graph
1345 systems 511 sites Sourced data

Supercomputers/Systems/BlueCrystal

United Kingdom · operational · hpc

BlueCrystal

Also known as University of Bristol BlueCrystal

Operated by University of Bristol .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
28.78 TFlop/s
HPL measured
Rpeak
37.63 TFlop/s
Rmax ÷ Rpeak
76.5%
Cores
3,360
Power
135 kW
Per watt
0.2 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
ClusterVision with IBM built the system (TOP500: ClusterVision/IBM)
ClusterVision
- Reported top500.orgbristol.ac.uk
Integrator -
IBM xSeries x3450 servers
IBM - Reported top500.orgbristol.ac.uk
CPU -
Intel Xeon E5462 quad-core 2.8 GHz, 3,360 cores
Intel - Reported top500.org

The read

The University of Bristol's BlueCrystal cluster, opened in May 2008 as a 7 million pound facility built by ClusterVision, IBM and ClearSpeed that the university said could do more than 37 trillion calculations a second. TOP500 lists it as an IBM xSeries x3450 cluster of Xeon E5462 quad-core 2.8 GHz processors on InfiniBand, 3,360 cores, 28.78 TFlop/s Rmax, 37.63 TFlop/s Rpeak and 135 kW running Linux, ranked 67th in June 2008, 87th, 175th, 240th and 378th in June 2010 (its last list). The university's separate documentation describes a smaller Opteron-based Phase 1 (92 standard nodes); this record covers only the Xeon system that TOP500 lists, and the university's phase numbering for it is not established here.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
bristol.ac.uknames system only-
top500.orgnames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.

Further reading