Supercomputers/Systems/CoreWeave Lancaster AI Data Center
USA · planned · ai training
CoreWeave Lancaster AI Data Center
Operated by CoreWeave at CoreWeave Lancaster Campus .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - CoreWeave is the primary tenant of the Lancaster campus: 100 MW initially, up to 300 MW, up to 6 billion dollars invested | CoreWeave | - | Reported | investors.coreweave.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 6 USD bn | 2025-07-15 | Design target | CoreWeave: investment of up to 6 billion USD for Lancaster PA, initial 100 MW expandable to 300 MW. Upper bound over the full build, not committed spend. | investors.coreweave.com |
The read
CoreWeave's planned Lancaster, Pennsylvania AI data center, announced 15 July 2025 at the Pennsylvania Energy and Innovation Summit as a multi-billion dollar commitment of up to 6 billion dollars, providing 100 MW initially and expandable to 300 MW. Chirisa Technology Parks and Machine Investment Group are co-developers, CoreWeave is the primary tenant, and Turner and Wohlsen are the general contractors per trade press. The announcement gives no delivery date or GPU specification, so the row stays planned as of the announcement. Both cited pages are CoreWeave's own, so the tier is reported. It has never submitted an HPL result.
Timeline
- 2025-07-15 Announced source
Site & facility
Change history
- 2026-10-02 Added CoreWeave Lancaster AI Data Center (CoreWeave)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| investors.coreweave.com | could not be fetched | - |
| coreweave.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.