Supercomputers/Systems/Shakti Cloud
India · operational · ai training
Shakti Cloud
Operated by Yotta Data Services at Yotta Shakti Cloud .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 84.31 PFlop/s
- Rpeak
- 102.8 PFlop/s
- Rmax ÷ Rpeak
- 82.0%
- Cores
- 294,336
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Shakti Cloud, and those in India. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 84.31 PFlop/s | #27 of 202 · top 13% | #1 of 16 · highest |
| Rmax ÷ Rpeak | 82.0 % | #62 of 199 · top 31% | #6 of 16 · top 33% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge XE9680 | Dell Technologies | - | Reported | top500.org |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W NVIDIA H100 80GB | NVIDIA | - | Reported | top500.orgyotta.com |
| CPU | Intel Xeon Platinum 8480C CPUs x86-64 · 56C · 2 GHz · Intel 7 · 350 W Xeon Platinum 8480L 56C 2GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR400 | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Shakti Cloud runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand NDR400 | 2026-06 | Press report | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Ubuntu 22.04 with NVIDIA CUDA 12.4 compiler, cuBLAS 12.4 and Open MPI 4.1.4 (HPL run) | 2026-06 | Press report | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | IndiaAI Mission: Yotta is an empanelled GPU compute provider reportedly supplying over half of the mission's advanced GPU capacity | 2025-05 | Vendor stated | yotta.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Public GPU cloud; Sarvam is the first named customer training a sovereign Indian LLM on Shakti Cloud | 2025-05 | Vendor stated | yotta.com |
The read
One H100 slice of Yotta's broader Shakti Cloud fleet, an NVIDIA Reference Platform Cloud Partner supplying over half of India's sovereign AI Mission GPU capacity. The broader Shakti Cloud program is well documented by NVIDIA's own case study, but no source ties an exact GPU count or date to this specific TOP500-benchmarked slice beyond the listing itself.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Nearby in scale
The machines closest to Shakti Cloud by Rmax, smaller to larger.
Related systems
Same operator
- Yotta D2 Blackwell Ultra Cluster · India, under construction
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA H100 SXM5, Intel Xeon Platinum 8480C, NVIDIA InfiniBand NDR (Quantum-2) |
| yotta.com | names system and part | NVIDIA H100 SXM5 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.