Supercomputers/Systems/Cardinal
USA · operational · mixed
Cardinal
Also known as OSC Cardinal (GPU partition)
Operated by Ohio Supercomputer Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 5.04 PFlop/s
- Rpeak
- 7.58 PFlop/s
- Rmax ÷ Rpeak
- 66.5%
- Cores
- 18,960
- Power
- 82.6 kW
- Per watt
- 61.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Cardinal, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 5.04 PFlop/s | #172 of 234 · bottom 28% | #83 of 332 · top 25% |
| Energy efficiency | 61.0 GF/W | #24 of 121 · top 19% | #8 of 162 · top 4% |
| Rmax ÷ Rpeak | 66.5 % | #157 of 231 · bottom 33% | #237 of 331 · bottom 29% |
| Power draw | 83 kW | #116 of 126 · bottom 9% | #162 of 171 · bottom 6% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge XE9640 (GPU nodes), C6620 (compute nodes) | Dell Technologies | - | Verified | top500.orgosc.edu |
| Accelerator | NVIDIA H100 SXM5 94GB Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 32 nodes x 4 NVIDIA H100 94GB | NVIDIA | 128 reported | Verified | osc.edutop500.org |
| CPU | - Intel Xeon Platinum 8470 52C 2GHz (GPU nodes) | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds ConnectX-7 NDR Infiniband (NDR200 and NDR400) | NVIDIA | - | Verified | top500.orgosc.edu |
Engineering, funding and access
What Cardinal runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 378 nodes326 dense compute, 32 GPU (four NVIDIA H100 94GB each), 16 analytics and 4 login nodes, all Dell. | 2026-11 | Operator stated | osc.edu |
| Interconnect and topology | NDR200 InfiniBand on CPU nodes; four NDR400 InfiniBand HCAs with GPUDirect on GPU nodes | 2026-11 | Operator stated | osc.edu |
| Cooling design | Direct-to-the-chip liquid cooling for all nodes from two coolant distribution units, in 9 racks | 2026-11 | Operator stated | osc.edu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Job scheduler | Slurm with the PBS compatibility layer disabled | 2026-11 | Operator stated | osc.edu |
| Programming and software stack | Red Hat Enterprise Linux 9 with the OSC module systemTOP500 lists RHEL 9.2 for the GPU partition. | 2026-11 | Operator stated | osc.edu |
| Programming and software stack | Intel, oneAPI and GCC compiler suites for C, C++ and Fortran | 2026-11 | Operator stated | osc.edu |
The read
The Ohio Supercomputer Center's Dell-built Cardinal cluster. OSC describes 32 PowerEdge XE9640 GPU nodes with four NVIDIA H100 94GB GPUs each (128 in total) plus 326 dense compute nodes with Intel Xeon CPU Max processors, on NDR InfiniBand with direct-to-chip liquid cooling in nine racks, about 10.5 petaflops theoretical peak overall. TOP500 lists the GPU partition at 18,960 cores, Rmax 5.04 PFlop/s, Rpeak 7.58 PFlop/s and 82.6 kW; it first ranked 211th on the November 2024 list and 306th on June 2026. OSC's page does not give an installation site beyond Columbus, so no site is attached.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Cardinal, the Ohio Supercomputer Center's H100 system, 211th on the November 2024 TOP500
Nearby in scale
The machines closest to Cardinal by Rmax, smaller to larger.
- CUBOX Cray XD6500 · South Korea, operational · 4.96 PFlop/s
- BioHive-1 · USA, operational · 4.9 PFlop/s
- Flow Type II · Japan, decommissioned · 4.88 PFlop/s
- Athena · Poland, operational · 5.05 PFlop/s
- Tigris (RIT) · USA, operational · 5.08 PFlop/s
- Dhabi Supercomputer · United Arab Emirates, operational · 5.09 PFlop/s
Related systems
Same operator
- Ascend (OSC) · USA, operational, 2023
- Owens · USA, decommissioned, 2016
- Oakley · USA, decommissioned, 2012
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA H100 SXM5 94GB |
| osc.edu | names system, part and count | NVIDIA H100 SXM5 94GB, NVIDIA InfiniBand NDR (Quantum-2) · counts: 128 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.