COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Dream-AI

South Korea · operational · mixed

Dream-AI

Also known as GIST Dream-AI; GIST HPC-AI public infrastructure

Operated by GIST at GIST Supercomputing Center (Gwangju) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
3.18 PFlop/s
HPL measured
Rpeak
6.42 PFlop/s
Rmax ÷ Rpeak
49.5%
Cores
36,960
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Dream-AI, and those in South Korea. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax3.18 PFlop/s-#17 of 32 · bottom 49%
Rmax ÷ Rpeak49.5 %-#30 of 32 · bottom 7%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Inspur NF5688M6
Inspur - Reported top500.org
Accelerator NVIDIA A100 SXM4 40GB
Accelerators
CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W
NVIDIA A100 SXM4 40 GB
NVIDIA - Reported top500.org
CPU -
Intel Xeon Gold 6330 28C 2GHz
Intel - Reported top500.org
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Mellanox HDR Infiniband
NVIDIA - Reported top500.org
Operating system Ubuntu Server
Operating systems
Linux distribution · Open source, free with paid support tiers
Ubuntu 20.04.1 LTS
Canonical
- Reported top500.org

Engineering, funding and access

What Dream-AI runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Storage capacity10 PB2022-11Press reportseoul.co.kr

Funding

ItemDetailAs ofBasisSource
Funded byShared-infrastructure project led by GIST at 14 billion won, with the Ministry of Science and ICT, Gwangju city and partnersPart of a 411.9 billion won Gwangju AI industry convergence complex over 2020-20242022-11Press reportseoul.co.kr

Access

ItemDetailAs ofBasisSource
How researchers get timeLarge-scale AI training for domestic industry, academia and research partners and global partners; education use via Gwangju AI convergence university programme2022-11Press reportseoul.co.kr

The read

Dream-AI is the HPC-AI shared infrastructure at the GIST Super Computing Center in Gwangju, South Korea. TOP500 lists an Inspur NF5688M6 cluster with Intel Xeon Gold 6330 28C 2GHz hosts, NVIDIA A100 SXM4 40 GB GPUs and Mellanox HDR InfiniBand on Ubuntu 20.04.1, with 36,960 cores, Rmax 3.18 and Rpeak 6.42 PFlop/s; it debuted 178th in November 2022 and was 406th in June 2026. Seoul Shinmun (28 November 2022) independently gives 178th, 3.18 PFlop/s HPL, about 6.4 PFlop/s peak and 10 PB of storage at 200 GB/s, funded with 14 billion won by the Ministry of Science and ICT, Gwangju City and the national ICT promotion agency. That article does not state the GPU model or count. TOP500 gives 2022 as the install year; no page fetched gives an in-service date, so none is recorded.

Timeline

  • 2022-11 Listed at #178 on the TOP500 (November 2022) source
  • 2022-11 Dream-AI enters pilot operation at the GIST Super Computing Center in Gwangju source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Change history

Nearby in scale

The machines closest to Dream-AI by Rmax, smaller to larger.

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR, Ubuntu Server
seoul.co.krdoes not name this system-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading