Compute·Atlas

Supercomputers/Systems/Titan

USA · decommissioned · hpc

Titan

Also known as Cray XK7

Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Measured performance

Rmax
17.59 PFlop/s
HPL measured
Rpeak
27.11 PFlop/s
Rmax ÷ Rpeak
64.9%
Cores
560,640
Power
8.21 MW
Per watt
2.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator
Cray XK7
Cray Reported olcf.ornl.gov
Accelerator NVIDIA Tesla K20X
Accelerators
NVIDIA K20x
NVIDIA 18,688
reported
Reported olcf.ornl.gov
CPU AMD Opteron 6274 (Interlagos)
CPUs
Opteron 6274 16C 2.2GHz
AMD 18,688
reported
Reported olcf.ornl.gov
Interconnect Cray Gemini
Interconnect
Cray Gemini interconnect
Cray Reported olcf.ornl.gov
Operating system Cray Linux Environment
Operating systems
Cray Linux Environment
Cray Reported olcf.ornl.gov

The read

Jaguar rebuilt with one NVIDIA K20X per node. The first US No. 1 whose performance came predominantly from GPUs, and the origin of the accelerator-share question this site exists to answer properly: by machine count Titan was one system, but by installed FLOPS it moved a large fraction of US leadership compute onto a single accelerator vendor in one procurement.

Timeline

  • 2011 Announced source
  • 2012-11 List debut at #1 (November 2012) source
  • 2012-11 First operational source
  • 2019-08 Decommissioned source

Public list appearances

Pointers only — rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993