Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 30.03 PFlop/s
- Rpeak
- 40.18 PFlop/s
- Rmax ÷ Rpeak
- 74.7%
- Cores
- 660,800
- Power
- 6.28 MW
- Per watt
- 4.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Crossroads, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 30.03 PFlop/s | #59 of 257 · top 23% | #21 of 332 · top 6% |
| Energy efficiency | 4.8 GF/W | #128 of 135 · bottom 6% | #46 of 162 · top 28% |
| Rmax ÷ Rpeak | 74.7 % | #123 of 256 · top 48% | #165 of 331 · top 50% |
| Power draw | 6,284 kW | #11 of 139 · top 7% | #10 of 171 · top 5% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX | Hewlett Packard Enterprise | - | Reported | top500.orglanl.gov |
| CPU | Intel Xeon CPU Max 9470 CPUs x86-64 · 52C · 2 GHz · Intel 7 · 350 W Xeon CPU Max 9480 56C 1.9GHz | Intel | - | Reported | top500.orglanl.gov |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.orglanl.gov |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid HPE Cray EX with next-generation liquid cooling | Hewlett Packard Enterprise | - | Reported | newswise.comnextplatform.com |
| Operating system | HPE Cray Operating System Operating systems SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux HPE Cray OS | Hewlett Packard Enterprise | - | Reported | top500.org |
Engineering, funding and access
What Crossroads runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | HPE Slingshot-11 | 2023 | Operator stated | eurekalert.orgtop500.org |
| Cooling design | Next-generation liquid cooling | 2020-09 | Operator stated | eurekalert.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | HPE Cray OS with HPE Cray MPI and Intel MKL | 2023 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | DOE National Nuclear Security Administration (NNSA) | 2020-09 | Operator stated | eurekalert.org |
| Funding programme | NNSA Advanced Simulation and Computing (ASC) program, third Advanced Technology system after TrinityOperated by the Alliance for Computing at Extreme Scale (ACES), a Los Alamos and Sandia partnership | 2020-09 | Operator stated | lanl.gov |
| Stated cost | 105 USD mContract awarded to HPE | 2020-09 | Operator stated | eurekalert.org |
| Procurement | Contract awarded March 2020 and announced 30 Sep 2020; first delivery planned for spring 2022, delivery complete summer 2022, production in fall 2022, with use through FY27The planned dates preceded the first operational date in this dataset; LANL describes it as the replacement for Trinity | 2020-09-30 | Operator stated | lanl.goveurekalert.org |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Tri-lab (LLNL, Los Alamos, Sandia) designers, analysts and computational scientists supporting stockpile stewardship and life extension work | 2020-09 | Operator stated | lanl.gov |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Expected at announcement to deliver about four times Trinity's overall performance; later TOP500 Rmax of 30.03 PFlop/s and HPCG of 0.967 PFlop/s | 2023-11 | Operator stated | top500.orgeurekalert.org |
The read
An NNSA ATS-3 stockpile-stewardship system, CPU-only (Xeon Max with on-package HBM, no accelerator), jointly built and operated by Los Alamos and Sandia under the ACES partnership and used tri-lab under the ASC program, the same joint-operator pattern already recorded for `trinity`. Sited at Los Alamos, so it reuses that site row. LANL's own platform page confirms the architecture and joint operatorship but not an exact Rmax/Rpeak/power figure, so those stay TOP500-sourced.
Timeline
- 2020-09-30 ACES announces a $105 million HPE contract for Crossroads, a Cray EX system with Slingshot and Xeon Sapphire Rapids to replace Trinity source
- 2023 First operational source
- 2023-11 First TOP500 appearance at number 24 with 30.03 PFlop/s Rmax source
- 2025-06 Listed at #166 on the Green500 (June 2025) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Los Alamos Strategic Computing Complex
- Location
- Los Alamos, NM, USA
- Cooling
- Chilled water
- Commissioned
- 1993
Change history
- 2026-09-22 Gained a Green500 rank pointer (#166 on the 2025-06 list)
Nearby in scale
The machines closest to Crossroads by Rmax, smaller to larger.
- PITAGORA · Italy, operational · 27.9 PFlop/s
- Setonix · Australia, operational · 27.16 PFlop/s
- Discovery 5 · USA, operational · 26.13 PFlop/s
- Voyager-EUS2 · USA, operational · 30.05 PFlop/s
- Viper-GPU · Germany, operational · 31.1 PFlop/s
- Hunter · Germany, operational · 31.68 PFlop/s
Related systems
Same site
- Venado · USA, operational, 2024
- Mission (LANL) · USA, planned
- Vision (LANL) · USA, planned
- Veritas (LANL) · USA, planned
- Trinity · USA, decommissioned, 2017
- Grizzly · USA, operational, 2016
Same operator
- Cielo · USA, decommissioned, 2011
- Mustang (LANL) · USA, decommissioned, 2011
- Cerrillos · USA, decommissioned, 2008
- Roadrunner · USA, decommissioned, 2008
- LANL Lightning · USA, operational, 2003
- ASCI Q · USA, decommissioned, 2002
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon CPU Max 9470, HPE Slingshot-11, HPE Cray Operating System |
| lanl.gov | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.