COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Industrial AI Cloud

Germany · operational · ai training

Industrial AI Cloud

Also known as Deutsche Telekom Industrial AI Cloud (Munich)

Operated by Deutsche Telekom at Deutsche Telekom Tucherpark Data Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA B200 SXM
Accelerators
CUDA (Blackwell) · TSMC 4NP · 1,000 W
Nearly 10,000 NVIDIA Blackwell GPUs across NVIDIA DGX B200 systems and RTX PRO Servers
NVIDIA 10,000
reported
Verified telekom.comblogs.nvidia.com

Engineering, funding and access

What Industrial AI Cloud runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designWater from the nearby Eisbach river; waste heat planned to heat the Tucherpark district2026-02-04Operator statedtelekom.com

Software

ItemDetailAs ofBasisSource
Programming and software stackSAP Business Technology Platform and AI Foundation, and Siemens SIMCenter simulation software2026-02-04Operator statedtelekom.com
Programming and software stackNVIDIA AI Enterprise and NVIDIA Omniverse, integrated with Deutsche Telekom's cloud2025-11-04Operator statedblogs.nvidia.com

Funding

ItemDetailAs ofBasisSource
ProcurementBuilt with NVIDIA, data center partner Polarise and SAP in a gutted former Hypovereinsbank data center in about six months; T-Systems runs the infrastructure and platform layer2026-02-04Operator statedtelekom.com

Access

ItemDetailAs ofBasisSource
How researchers get timeOpen to industry, startups, research institutions and the public sector, who book compute and platform services flexibly from pilots to productionNVIDIA's November 2025 announcement describes early access to GPU capacity at scale with flexible contracts2026-02-04Operator statedtelekom.comblogs.nvidia.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 10,000 accelerators 2026-02 Operator stated About 10,000 Blackwell GPUs (DGX B200 and RTX PRO servers), launched 4 Feb 2026 and stated to be running at over a third of capacity. telekom.comnvidianews.nvidia.com

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

Deutsche Telekom and NVIDIA's roughly EUR 1 billion sovereign AI factory at a refurbished former Hypovereinsbank data center in Munich's Tucherpark district, officially entering operation on 4 February 2026. Built for close to 10,000 NVIDIA Blackwell GPUs (NVIDIA DGX B200 systems and RTX PRO Servers) across about 10,700 square meters, with a vendor-stated AI compute capacity of up to 0.5 EFLOPS (an AI/FP8 rate, not an HPL measurement, so no Rmax or Rpeak is recorded). Cooled with water drawn from the nearby Eisbach river and run on renewable power, with waste heat fed into district heating for the surrounding neighborhood. Early tenants include Siemens, Agile Robots, Wandelbots, Quantum Systems, PhysicsX and Perplexity, and it hosts the SOOFI project training an approximately 100 billion parameter open-source European LLM with Leibniz Universitat Hannover.

Timeline

  • 2024-11 Announced source
  • 2025-11-04 Deutsche Telekom and NVIDIA unveiled the Industrial AI Cloud in Berlin with up to 10,000 Blackwell GPUs and go-live set for early 2026 source
  • 2026-02-04 First operational source

Site & facility

Deutsche Telekom Tucherpark Data Center

Location
Munich, Germany
Commissioned
2026

Change history

Nearby in scale

The machines closest to Industrial AI Cloud by accelerator count, smaller to larger.

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
blogs.nvidia.comnames system, part and countNVIDIA B200 SXM · counts: 10000
telekom.comnames system, part and countNVIDIA B200 SXM · counts: 10000

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading