Supercomputers/Systems/Olivia

Norway · operational · mixed

Olivia

Operated by Sigma2 at Lefdal Mine Data Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
13.20 PFlop/s
HPL measured
Rpeak
16.80 PFlop/s
Rmax ÷ Rpeak
78.6%
Cores
-
Power
219 kW
Per watt
60.3 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Olivia, and those in Norway. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax13.20 PFlop/s#100 of 202 · top 49%#1 of 10 · highest
Energy efficiency60.3 GF/W#26 of 99 · top 26%-
Rmax ÷ Rpeak78.6 %#84 of 199 · top 42%#5 of 10 · top 44%
Power draw219 kW#73 of 104 · bottom 31%-

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray Supercomputing EX (EX4000 platform)
Hewlett Packard Enterprise - Reported sigma2.notop500.org
Accelerator NVIDIA GH200 Grace Hopper Superchip
Accelerators
Arm CPU + CUDA GPU · TSMC 4N
448 NVIDIA GH200 Grace Hopper superchips (304 at launch, 144 added February 2026)
NVIDIA 448
reported
Reported sigma2.nodocumentation.sigma2.no
CPU AMD EPYC 9005 (Turin)
CPUs
x86-64 · 192C · 2.7 GHz · TSMC N3E · 500 W
252 CPU nodes, two 128-core AMD EPYC Turin (Zen 5c) CPUs each, 64,512 cores
AMD - Reported documentation.sigma2.no
Interconnect HPE Slingshot-11
Interconnect
Dragonfly · 200 Gb/s per port · Around 2 microseconds
HPE Slingshot, Dragonfly topology, 200 Gbit/s
Hewlett Packard Enterprise - Reported documentation.sigma2.no
Storage HPE Cray ClusterStor E1000
Storage
Lustre appliance, flash and disk tiers · 700 PB on Frontier (Orion) · About 10 TB/s peak
HPE Cray ClusterStor E1000, 5.3 PB
Hewlett Packard Enterprise - Reported sigma2.no
Cooling -
Direct liquid cooling of compute and accelerator nodes
Hewlett Packard Enterprise - Reported documentation.sigma2.no

Engineering, funding and access

What Olivia runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes364 nodes252 CPU nodes plus 112 GPU nodes (448 GH200 superchips); the GPU count rose from 304 to 448 in February 2026.2026-02Operator stateddocumentation.sigma2.nosigma2.no
Storage capacity5.3 PBHPE Cray ClusterStor E1000; the NRIS documentation lists 3.159 PB disk plus 1.107 PB flash.2025-06Operator statedsigma2.nodocumentation.sigma2.no
Interconnect and topologyHPE Slingshot; 200 Gb/s injection per CPU node and 800 Gb/s per GPU node2026-02Operator stateddocumentation.sigma2.nosigma2.no
Cooling designDirect liquid cooling: two HPE Cray EX4000 DLC compute cabinets with one CDU; Sigma2 cites a carbon footprint about 30% below Betzy2025-06Operator statedsigma2.no

Software

ItemDetailAs ofBasisSource
Parallel filesystemHPE Cray ClusterStor E1000 with 3.159 PB disk and 1.107 PB solid state, plus 3.84 TB local NVMe per CPU node2026-02Operator stateddocumentation.sigma2.no

Funding

ItemDetailAs ofBasisSource
Funded byNorwegian government AI research investments, with a 225 million NOK contract value2025-06Operator statedsigma2.no
ProcurementSigma2 ran a procurement competition and signed a 225 million NOK contract with Hewlett-Packard Norge AS (HPE) in June 20242024-06Operator statedsigma2.no

Access

ItemDetailAs ofBasisSource
How researchers get timeOpen to researchers across Norway regardless of institution; apply through Sigma2 resource allocation, evaluated by the Resource Allocation Committee2026Operator statedsigma2.nosigma2.no
Access pagewww.sigma2.no/how-apply-resources2026Operator statedsigma2.no

Results

ItemDetailAs ofBasisSource
Notable result2025: debuted on both the TOP500 and Green500 in June 2025; Sigma2 says it raises AI computing power on the national systems 25 times2025-06Operator statedsigma2.no

The read

Norway's national flagship system, an HPE Cray EX at the Lefdal Mine Data Center in Nordfjordeid, procured by Sigma2 under a contract signed in June 2024 (225 million NOK) and inaugurated on 17 June 2025 with full service in autumn 2025. Sigma2's documentation lists 252 CPU nodes with two 128-core AMD EPYC Turin CPUs each (64,512 cores) and 76 accelerator nodes carrying 304 NVIDIA GH200 superchips on HPE Slingshot with a Dragonfly topology. Sigma2 announced on 27 February 2026 that 144 more GH200 superchips were added, for 448 in total. The 13.20 PFlop/s Rmax, 16.80 PFlop/s Rpeak and 219 kW figures are TOP500's for the original 304-superchip configuration (rank 134 on the November 2025 list); the core count is left blank because the expansion post-dates those runs and no post-expansion figure was confirmed.

Timeline

  • 2024-06 Announced source
  • 2024-06 Sigma2 signed a 225 million NOK contract with HPE for Olivia source
  • 2025-03 Olivia hardware delivered after the factory acceptance test in Chippewa Falls, Wisconsin source
  • 2025-06 First operational source
  • 2025-06-17 Olivia inaugurated by Minister Sigrun Aasland source
  • 2025-11 Listed at #134 on the TOP500 (November 2025) source
  • 2026-02 Olivia GPU capacity raised from 304 to 448 GH200 superchips source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Lefdal Mine Data Center

Location
Nordfjordeid, Norway
Cooling
Direct liquid cooling
Commissioned
2025

Change history

Nearby in scale

The machines closest to Olivia by Rmax, smaller to larger.

Same operator

  • Betzy · Norway, operational, 2020
  • Saga · Norway, operational, 2019
  • Fram · Norway, decommissioned, 2016

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA GH200 Grace Hopper Superchip, HPE Slingshot-11, HPE Cray ClusterStor E1000
sigma2.nonames system, part and countNVIDIA GH200 Grace Hopper Superchip, HPE Cray ClusterStor E1000 · counts: 448

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.