COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Volkswagen HPC 124Rj-1

Norway · operational · hpc

Volkswagen HPC 124Rj-1

Also known as NEC HPC 124Rj-1 at Green Mountain

Operated by Volkswagen Group .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.96 PFlop/s
HPL measured
Rpeak
4.46 PFlop/s
Rmax ÷ Rpeak
66.4%
Cores
53,568
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
NEC HPC 124Rj-1
NEC - Reported top500.org
CPU Intel Xeon Platinum 8358
CPUs
x86-64 · 32C · 2.6 GHz · 10 nm · 250 W
Intel Xeon Platinum 8358 32C 2.6GHz
Intel - Reported top500.org
Interconnect Omni-Path Architecture
Interconnect
Fat tree · 100 Gb/s per port · About 1 microsecond
Intel Omni-Path
Cornelis Networks
- Reported top500.org
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.org

The read

An NEC HPC 124Rj-1 cluster with Intel Xeon Platinum 8358 32C 2.6GHz CPUs, Intel Omni-Path and Red Hat Enterprise Linux, listed on the TOP500 at Volkswagen AG at Green Mountain A/S with 53,568 cores, Rmax 2.96 PFlop/s and Rpeak 4.46 PFlop/s, first at rank 246 on June 2023 and rank 455 on June 2026. Green Mountain and Volkswagen state that VW opened HPC operations in two data halls totalling 2.75 MW at Green Mountain's Rjukan, Norway site in June 2019 for crash-test and virtual wind-tunnel simulation, powered by hydroelectricity. Neither page ties this particular machine to Rjukan or states its hardware, so it is left unlocated and the tier is reported.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
greenmountain.nonames system only-
top500.orgnames system and partIntel Xeon Platinum 8358, Omni-Path Architecture

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading