Supercomputers/Systems/Meta Rosemount (Minnesota)
USA · operational · ai training
Meta Rosemount (Minnesota)
Also known as Meta Rosemount AI data center
Operated by Meta Platforms at Meta Rosemount Data Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Meta designs, builds and operates the 715,000 sq ft Rosemount, Minnesota data center, optimized for AI workloads | Meta Platforms | - | Reported | datacenters.atmeta.com |
| Accelerator | NVIDIA B200 SXM Accelerators CUDA (Blackwell) · TSMC 4NP · 1,000 W Epoch AI estimate: about 85,400 NVIDIA B200 GPUs (modelled, not disclosed by Meta) | NVIDIA | 85,400 estimated | Reported | epoch.ai |
Engineering, funding and access
What Meta Rosemount (Minnesota) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Air-cooled chillers: Epoch AI counts 68 units with 229.8 MW capacityCounted from satellite imagery; Meta's announcement does not describe cooling. | 2026-06 | Third-party estimate | epoch.ai |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Stated cost | 800 USD mMeta states more than $800 million for the 715,000 sq ft campus. | 2024-03-14 | Operator stated | datacenters.atmeta.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 85,400 accelerators | 2026-10-02 | Third-party estimate | About 85,400 B200. Epoch AI chip estimate (modelled from satellite imagery, cooling equipment and chip availability); not an operator disclosure. | epoch.ai |
| Stated investment | 0.8 USD bn | 2024-03 | Operator stated | Meta: investment of more than 800 million dollars at announcement; floor value, buildings and fit-out not split from compute | datacenters.atmeta.com |
| IT power | 178 MW | 2026-10-02 | Third-party estimate | Epoch AI modelled IT power from satellite imagery and permits; not operator-stated. | epoch.ai |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Grid | Xcel Energy | - | operating | 2026-10 | Operator stated | Meta says it worked with Xcel Energy to plan energy for the Rosemount data center and pays full costs; no MW stated. | datacenters.atmeta.com |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
The read
Meta's Rosemount, Minnesota data center, announced on 14 March 2024 as an investment of more than 800 million dollars across 715,000 square feet on former UMore Park land, powered by new renewable projects and described by Meta as optimized for its AI workloads. Meta publishes no capacity or hardware. Epoch AI's AI data centers dataset (CC BY 4.0) estimates about 85,400 B200 chips and 178 MW of IT power, with buildings 1 and 2 estimated operational by June 2026 from satellite imagery and an air quality permit. Meta has not announced an in-service date, so operational status and the figures are Epoch's modelled estimates, recorded in the metrics table only. Hardware rests on Epoch alone, so the tier is reported.
Timeline
Site & facility
Change history
- 2026-10-04 Added Meta Rosemount (Minnesota)
Nearby in scale
The machines closest to Meta Rosemount (Minnesota) by accelerator count, smaller to larger.
- Firebird Armenian AI Factory (DC-1) · Armenia, operational · 70,000 accelerators
- Meta Montgomery (Alabama) · USA, operational · 69,100 accelerators
- Meta Cheyenne (Wyoming) · USA, operational · 68,400 accelerators
- xAI Colossus · USA, operational · 100,000 accelerators
- Solstice · USA, planned · 100,000 accelerators
- JD Cloud 100,000-GPU Cluster · China, planned · 100,000 accelerators
Related systems
Same operator
- Meta Cheyenne (Wyoming) · USA, operational
- Meta GenAI cluster (InfiniBand) · USA, operational, 2024
- Meta GenAI cluster (RoCE) · USA, operational, 2024
- Meta Hyperion · USA, under construction
- Meta Montgomery (Alabama) · USA, operational
- Meta El Paso (Texas) · USA, under construction
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| datacenters.atmeta.com | names system only | - |
| epoch.ai | names system and part | NVIDIA B200 SXM |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.