COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Meta Temple (Texas)

USA · operational · mixed

Meta Temple (Texas)

Also known as Meta Temple data center

Operated by Meta Platforms at Meta Temple Data Center Site .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Meta Temple Data Center, three buildings totalling 152 MW, JE Dunn general contractor
Meta Platforms - Reported jedunn.comepoch.ai

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 152 MW 2025-12 Third-party estimate Contractor JE Dunn describes the three-building campus as totalling 152 MW; Epoch AI dates Buildings 1 and 2 operational at 152 MW in December 2025 jedunn.comepoch.ai
IT power 178 MW 2026-09 Third-party estimate Epoch AI projection once Building 3 is operational, from a regulatory filing completion date epoch.ai

The read

Meta's data center in Temple, Texas: a 386-acre greenfield campus of three buildings and over 750,000 square feet, built by JE Dunn from April 2022, totalling 152 MW per the contractor and described as Meta's 21st data center globally. Epoch AI's reading of Texas TDLR filings and imagery says an H-shaped conventional building was demolished mid-construction in 2023 in favour of Meta's AI-optimised design, with Buildings 1 and 2 operational by December 2025 and Building 3 due by 30 September 2026 for about 178 MW. Epoch assumes about 80,000 Nvidia B300 accelerators and air-cooled condensers; Meta has published no hardware for the site, so no accelerator count is entered. The 152 MW (contractor) and 178 MW (Epoch projection) figures describe different build states, not a conflict. Compare meta-rosemount and meta-montgomery.

Timeline

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
epoch.ainames system only-
jedunn.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading