Supercomputers/Systems/Mustang (LANL)
USA · decommissioned · hpc
Mustang (LANL)
Also known as LANL Mustang
Operated by Los Alamos National Laboratory at Los Alamos Strategic Computing Complex .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 230.60 TFlop/s
- Rpeak
- 340.92 TFlop/s
- Rmax ÷ Rpeak
- 67.6%
- Cores
- 37,056
- Power
- 540.4 kW
- Per watt
- 0.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Mustang (LANL), and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 230.60 TFlop/s | #99 of 179 · bottom 46% | #230 of 332 · bottom 32% |
| Energy efficiency | 0.4 GF/W | #96 of 133 · bottom 29% | #134 of 162 · bottom 18% |
| Rmax ÷ Rpeak | 67.6 % | #147 of 178 · bottom 19% | #221 of 331 · bottom 34% |
| Power draw | 540 kW | #57 of 135 · top 42% | #84 of 171 · top 49% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Appro Xtreme-X 1320H-LANL | Appro HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | theregister.comtop500.org |
| CPU | - AMD Opteron 6176 12C 2.3GHz | AMD | - | Reported | top500.org |
Engineering, funding and access
What Mustang (LANL) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,600 nodes25 racks of Appro Xtreme-X; press reports give 38,400 cores while TOP500 lists 37,056 | 2011-10 | Press report | theregister.com |
| Total memory | 102.4 TB64 GB per node | 2011-10 | Press report | theregister.com |
| Interconnect and topology | Single-rail 4x Mellanox QDR InfiniBand in a fat treeAppro release as carried by Digital Engineering | 2011-10 | Vendor stated | digitalengineering247.comtheregister.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Tri-Laboratory Common Computing Environment software stack on Red Hat Enterprise Linux | 2011-10 | Vendor stated | digitalengineering247.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | LANL Institutional Computing Program, with the DOE Office of Science climate modelling project COSIM as a partner in the acquisition | 2011-10 | Vendor stated | digitalengineering247.com |
| Stated cost | 10 USD mAppro's release valued it at approximately $10 million in production computing capability; The Register also reports about $10 million | 2011-10 | Vendor stated | digitalengineering247.comtheregister.com |
The read
Appro Xtreme-X cluster for Los Alamos's unclassified Turquoise network. TOP500 lists 37,056 Opteron 6176 12C 2.3 GHz cores on Infiniband QDR (RHEL 6.1), Rmax 230.6 TFlop/s, Rpeak 340.92 TFlop/s, 540.4 kW, first ranked 46th in November 2011 and present on nine lists to November 2015. The Register's October 2011 report describes 1,600 two-socket nodes with 64 GB each (38,400 cores, 102.4 TB), 353 teraflops peak and a single-rail QDR InfiniBand fat tree, used for ocean, wildfire, plasma, materials and reactor modelling; TOP500's core count is used here. No retirement date was found in a fetched source and the system has been absent from the TOP500 since November 2015, so it is recorded as decommissioned with no date. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Los Alamos Strategic Computing Complex
- Location
- Los Alamos, NM, USA
- Cooling
- Chilled water
- Commissioned
- 1993
Change history
- 2026-10-02 Added Mustang, Los Alamos's Appro Opteron cluster
Nearby in scale
The machines closest to Mustang (LANL) by Rmax, smaller to larger.
- Iridis 4 · United Kingdom, operational · 0.23 PFlop/s
- Cypress (Tulane) · USA, operational · 0.22 PFlop/s
- RWTH Compute Cluster 2011 · Germany, operational · 0.22 PFlop/s
- Quinde I · Ecuador, decommissioned · 0.23 PFlop/s
- BURA · Croatia, operational · 0.23 PFlop/s
- P&G Apollo 6000 Cluster · USA, operational · 0.23 PFlop/s
Related systems
Same site
- Cielo · USA, decommissioned, 2011
- Roadrunner · USA, decommissioned, 2008
- Grizzly · USA, operational, 2016
- Trinity · USA, decommissioned, 2017
- ASCI Q · USA, decommissioned, 2002
- Crossroads · USA, operational, 2023
Same operator
- Cerrillos · USA, decommissioned, 2008
- LANL Lightning · USA, operational, 2003
- ASCI Blue Mountain · USA, decommissioned, 1998
- Venado · USA, operational, 2024
- Mission (LANL) · USA, planned
- Vision (LANL) · USA, planned
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system only | - |
| theregister.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.