Supercomputers/Systems/Microsoft Fairwater (Wisconsin)
USA · operational · ai training
Microsoft Fairwater (Wisconsin)
Deep dive: Microsoft Fairwater: two sites, few numbers
Operated by Microsoft at Microsoft Mount Pleasant AI datacenter site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | NVIDIA GB200 NVL72 Accelerators Arm CPU + CUDA GPU · TSMC 4NP NVIDIA GB200 servers with 72 NVIDIA Blackwell GPUs per rack | NVIDIA | - | Reported | w.media |
Engineering, funding and access
What Microsoft Fairwater (Wisconsin) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Closed-loop liquid cooling for more than 90% of the facility, filled during construction and recirculated; the rest uses outside air and water only on the hottest days | 2025-09-18 | Operator stated | blogs.microsoft.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Microsoft, with more than $7 billion committed to Wisconsin across two datacenters | 2025-09-18 | Operator stated | blogs.microsoft.com |
| Stated cost | 3,300 USD mInitial pledge for the first datacenter; a further $4 billion over three years is committed for a second datacenter of similar scale. | 2025-09-18 | Operator stated | blogs.microsoft.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Microsoft claims ten times the performance of today's fastest supercomputers for training frontier AI models; the metric is not definedQualitative marketing claim, not a measured FLOPS figure. | 2025-09-18 | Operator stated | blogs.microsoft.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 176,391 accelerators | 2026-04-16 | Third-party estimate | Epoch AI chip estimate, latest per chip type (B200); some rows are company disclosures, others modelled. | epoch.ai |
| Stated investment | 7 USD bn | 2025-09 | Operator stated | Microsoft: extra $4 bn for a second datacenter brings total Wisconsin investment to more than $7 bn; covers both Fairwater datacenters, floor value | blogs.microsoft.com |
| Facility power | 442 MW | 2026-05-15 | Third-party estimate | Epoch AI modelled gross facility power (IT plus cooling and overhead) at this timeline date. | epoch.ai |
| IT power | 369 MW | 2026-05-15 | Third-party estimate | Epoch AI modelled IT power from satellite imagery and permits at this timeline date; not operator-stated. | epoch.ai |
| Rack power | 140 kW | 2025-11 | Operator stated | Microsoft: Fairwater design rates about 140 kW per rack, 72 Blackwell GPUs per rack; blog describes the design of each Fairwater site, Wisconsin is site one; not a Wisconsin-only figure | blogs.microsoft.com |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Grid | We Energies | - | operating | 2025-09 | Operator stated | Microsoft pre-pays energy and electrical infrastructure under WE Energies tariffs for Mount Pleasant; no MW stated. Epoch lists WE Energies as the energy company. | blogs.microsoft.comepoch.ai |
| Wind and solar | - | 250 | contracted | 2025-09 | Operator stated | New 250 MW Portage County solar project, under construction, to match fossil-sourced kWh one for one. An offset on the grid, not a direct supply. | blogs.microsoft.com |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
The read
The first Fairwater site, in Mount Pleasant, Wisconsin. Microsoft states hundreds of thousands of NVIDIA GPUs, closed-loop liquid cooling for over 90% of the site, and completion in early 2026; only the trade-press report of 24 June 2026 says it is fully operational, and it derives from Microsoft's own release, so the tier stays reported. The GB200 servers at 72 GPUs per rack come from that same report, not from Microsoft's blog. No exact GPU count or power is published. Microsoft's qualitative claim of ten times today's fastest supercomputers is not a FLOPS figure and is not recorded as one.
Timeline
Site & facility
Microsoft Mount Pleasant AI datacenter site
- Location
- Mount Pleasant, WI, USA
- Cooling
- Closed-loop liquid cooling
- Commissioned
- 2025
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- First operational date: 2026-06 as recorded against Building 1 operational by 2026-04-16. Epoch AI cites a Microsoft post for the earlier date.
Change history
- 2026-10-04 AI datacenter metrics: Microsoft Fairwater (Wisconsin)
- 2026-09-19 Microsoft Fairwater Wisconsin added
Nearby in scale
The machines closest to Microsoft Fairwater (Wisconsin) by accelerator count, smaller to larger.
- Firmus Batam AI Factory · Indonesia, planned · 170,000 accelerators
- Meta Prometheus · USA, operational · 166,015 accelerators
- Microsoft Goodyear AI Datacenter · USA, operational · 116,400 accelerators
- Stargate Abilene · USA, operational · 201,600 accelerators
- xAI Colossus 2 · USA, operational · 220,000 accelerators
- AWS Ridgeland Campus · USA, operational · 261,200 accelerators
Related systems
Same operator
- Microsoft Pecos Campus · USA, planned
- SINES Data Campus GB300 Deployment · Portugal, operational, 2026
- Azure NDv6 GB300 Cluster · USA, operational, 2025
- Microsoft Azure AI datacenter (Narvik, Norway) · Norway, under construction
- Microsoft Azure AI supercomputer (Loughton, UK) · United Kingdom, under construction
- Microsoft Fairwater (Atlanta) · USA, operational
Same accelerator
- KDDI GPU Cloud · Japan, operational, 2026
- xAI Colossus 2 · USA, operational, 2026
- CoreWeave Vennesla (Bulk N01) · Norway, operational
- MAVERIC · Australia, under construction
- Mistral Campus AI (Bruyeres-le-Chatel) · France, operational
- Nano 4 GB200 · Taiwan, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| blogs.microsoft.com | names system only | - |
| w.media | names system and part | NVIDIA GB200 NVL72 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Related news
- Microsoft links Fairwater Atlanta and Wisconsin into one "AI superfactory" · MicrosoftThe two Fairwater sites are joined over a dedicated AI WAN fiber backbone so training jobs can span both facilities as one system rather than two separate clusters, a different scaling strategy than the single site gigawatt campuses xAI and Meta are building. Each rack carries up to 72 NVIDIA Blackwell GPUs; Microsoft has not disclosed a total GPU count for either site.