Supercomputers/Systems/River Bend (Fluidstack)
USA · under construction · ai training
River Bend (Fluidstack)
Also known as Hut 8 River Bend for Anthropic
Operated by Fluidstack at Hut 8 River Bend Campus .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Hut 8 develops and leases the River Bend campus to Fluidstack (245 MW critical IT, 330 MW utility capacity) | Hut 8 | - | Reported | canada.hut8.com |
| Integrator | - Fluidstack designs, deploys and operates the compute infrastructure for Anthropic at River Bend | Fluidstack | - | Reported | prnewswire.com |
Engineering, funding and access
What River Bend (Fluidstack) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Project financing of up to 85% loan-to-cost with J.P. Morgan as lead left underwriter and Goldman Sachs as co-underwriter, subject to definitive agreements | 2025-12 | Operator stated | canada.hut8.com |
| Procurement | 15-year triple-net lease of 245 MW IT capacity to Fluidstack worth $7.0 billion over the base term, with three 5-year renewal options; a Google backstop covers lease payments; Fluidstack has a right of first offer on up to 1,000 MW moreInitial data hall commissioning planned Q2 2027. | 2025-12 | Operator stated | canada.hut8.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Facility power | 330 MW | 2025-12-17 | Design target | Hut 8 8-K exhibit: 330 MW of utility capacity for the campus under construction. Utility capacity, may exceed facility draw at phase 1. | sec.gov |
| IT power | 245 MW | 2025-12-17 | Design target | Hut 8 8-K exhibit: 245 MW of IT capacity leased to Fluidstack (15 years); first hall Q2 2027. Phase 1 of the campus, not the 1,000 MW ROFO expansion. | sec.gov |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Grid | Entergy Louisiana | 330 | planned | 2025-12 | Regulatory filing | 10-K: River Bend 330 MW total utility capacity under construction; Hut 8 worked with Entergy Louisiana on interconnection. 245 MW of IT leased. | sec.gov |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
Compute deals
- 2025-12-17: Fluidstack and Hut 8 (datacenter lease , 245 MW, headline $7bn). sec.govsec.gov
All compute deals. Headline values are as announced, not additive.
The read
Hut 8's River Bend campus in West Feliciana Parish, Louisiana, leased to Fluidstack under a 15-year, 7.0 billion dollar lease for 245 MW of critical IT capacity with a Google financial backstop, as the first phase of a wider Hut 8, Fluidstack and Anthropic partnership. Hut 8 states 330 MW of utility capacity is under construction at the site and that Fluidstack holds a right of first offer on up to 1,000 MW of expansion subject to power. Hut 8's Q2 2026 results (4 August 2026) report vertical construction commenced, the campus substation under construction and initial long-lead equipment received, with the first data hall targeted for Q2 2027. Fluidstack designs, deploys and operates the compute for Anthropic. No page names the accelerator type or count, so no accelerator edge is recorded. Both sources are Hut 8's own, so the tier is reported. It has never submitted an HPL result.
Timeline
- 2025-12-17 Announced source
Site & facility
Change history
- 2026-10-02 Added River Bend (Fluidstack) (Fluidstack)
Related systems
Same operator
- Abernathy (Fluidstack) · USA, under construction
- Barber Lake (Fluidstack) · USA, under construction
- New Lebanon Campus (Fluidstack) · USA, under construction
- Lake Mariner (Fluidstack) · USA, under construction
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| canada.hut8.com | names system only | - |
| hut8.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.