COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Herder

Germany · planned · mixed

Herder

Also known as HLRS Herder

Operated by HLRS at HLRS, University of Stuttgart .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray Supercomputing GX5000 platform
Hewlett Packard Enterprise - Verified hlrs.deheise.de
Accelerator AMD Instinct MI430X
Accelerators
1,488 AMD Instinct MI430X GPUs, eight per node
AMD 1,488
reported
Reported heise.dehlrs.de
CPU -
372 AMD EPYC Venice CPUs, two per node
AMD 372
reported
Reported heise.de
Interconnect -
HPE Slingshot 400 switches
Hewlett Packard Enterprise - Reported hlrs.de
Storage -
Lustre-based HPE Cray Supercomputing Storage Systems E2000
Hewlett Packard Enterprise - Reported hlrs.de

Engineering, funding and access

What Herder runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Total memory643 TBPlanned HBM4 total of nearly 643 TB across 1,488 AMD Instinct MI430X GPUs with 432 GB each; DDR5 capacity was not yet known.2025-12Press reportheise.de
Interconnect and topologyHPE Slingshot 400Planned configuration.2025-12Operator statedhlrs.de
Cooling designHPE direct liquid cooling, with HPE Powersched dynamic power management; waste heat is to feed the University of Stuttgart Vaihingen campus district heating networkPlanned for the HLRS III data centre, then under construction.2025-12Operator statedhlrs.de

Software

ItemDetailAs ofBasisSource
Parallel filesystemLustre-based HPE Cray Supercomputing Storage Systems E2000Planned configuration.2025-12Operator statedhlrs.de
Programming and software stackHPE Supercomputing Management Software, supporting containerized HPC and AI workflows2025-12Operator statedhlrs.de

Funding

ItemDetailAs ofBasisSource
Funded byGerman Federal Ministry of Research, Technology and Space (BMFTR), through the Gauss Centre for Supercomputing2025-12Operator statedhlrs.deheise.de
Funded byBaden-Wurttemberg Ministry of Science, Research and the Arts2025-12Operator statedhlrs.deheise.de
ProcurementContract between the University of Stuttgart and HPE signed in Barcelona and announced on 2 December 2025; heise reports a cost of about EUR 100 millionThe cost figure comes from heise, not HLRS.2025-12Operator statedhlrs.deheise.de

The read

HLRS's next flagship, an HPE Cray GX5000 system with AMD Instinct MI430X GPUs and EPYC Venice CPUs on Slingshot 400 with a Lustre-based E2000 storage tier and fully direct-liquid cooling, due to arrive in the second half of 2027 and be operational by the end of 2027, funded by the federal research ministry (through the Gauss Centre) and Baden-Wurttemberg. HLRS gives the architecture and schedule and promises more than seven times Hunter's performance; heise reports 1,488 MI430X GPUs and 372 Venice CPUs (two CPUs and eight GPUs per node), 432 GB HBM4 per GPU, at least 340 PFlop/s FP64 and about EUR 100 million. The counts and peak rest on heise alone, so the tier is reported and no FLOPS are recorded for a machine not yet built.

Timeline

  • 2025-12-02 The University of Stuttgart and HPE announced the signed Herder contract, with delivery scheduled for the second half of 2027 source

Site & facility

HLRS, University of Stuttgart

Location
Stuttgart, Germany
Cooling
Direct liquid cooling
Commissioned
1996

Change history

Same site

  • HLRS NEC SX-8 · Germany, decommissioned, 2005
  • Baku (HLRS) · Germany, operational, 2009
  • Hermit · Germany, decommissioned, 2011
  • Hazel Hen · Germany, decommissioned, 2015
  • Hawk · Germany, decommissioned, 2020
  • Hunter · Germany, operational, 2025

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
heise.denames system, part and countAMD Instinct MI430X · counts: 1488
hlrs.denames system and partAMD Instinct MI430X

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading