Supercomputers/Systems/Herder
Germany · planned · mixed
Herder
Also known as HLRS Herder
Operated by HLRS at HLRS, University of Stuttgart .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray Supercomputing GX5000 platform | Hewlett Packard Enterprise | - | Verified | hlrs.deheise.de |
| Accelerator | AMD Instinct MI430X Accelerators 1,488 AMD Instinct MI430X GPUs, eight per node | AMD | 1,488 reported | Reported | heise.dehlrs.de |
| CPU | - 372 AMD EPYC Venice CPUs, two per node | AMD | 372 reported | Reported | heise.de |
| Interconnect | - HPE Slingshot 400 switches | Hewlett Packard Enterprise | - | Reported | hlrs.de |
| Storage | - Lustre-based HPE Cray Supercomputing Storage Systems E2000 | Hewlett Packard Enterprise | - | Reported | hlrs.de |
Engineering, funding and access
What Herder runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 643 TBPlanned HBM4 total of nearly 643 TB across 1,488 AMD Instinct MI430X GPUs with 432 GB each; DDR5 capacity was not yet known. | 2025-12 | Press report | heise.de |
| Interconnect and topology | HPE Slingshot 400Planned configuration. | 2025-12 | Operator stated | hlrs.de |
| Cooling design | HPE direct liquid cooling, with HPE Powersched dynamic power management; waste heat is to feed the University of Stuttgart Vaihingen campus district heating networkPlanned for the HLRS III data centre, then under construction. | 2025-12 | Operator stated | hlrs.de |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre-based HPE Cray Supercomputing Storage Systems E2000Planned configuration. | 2025-12 | Operator stated | hlrs.de |
| Programming and software stack | HPE Supercomputing Management Software, supporting containerized HPC and AI workflows | 2025-12 | Operator stated | hlrs.de |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | German Federal Ministry of Research, Technology and Space (BMFTR), through the Gauss Centre for Supercomputing | 2025-12 | Operator stated | hlrs.deheise.de |
| Funded by | Baden-Wurttemberg Ministry of Science, Research and the Arts | 2025-12 | Operator stated | hlrs.deheise.de |
| Procurement | Contract between the University of Stuttgart and HPE signed in Barcelona and announced on 2 December 2025; heise reports a cost of about EUR 100 millionThe cost figure comes from heise, not HLRS. | 2025-12 | Operator stated | hlrs.deheise.de |
The read
HLRS's next flagship, an HPE Cray GX5000 system with AMD Instinct MI430X GPUs and EPYC Venice CPUs on Slingshot 400 with a Lustre-based E2000 storage tier and fully direct-liquid cooling, due to arrive in the second half of 2027 and be operational by the end of 2027, funded by the federal research ministry (through the Gauss Centre) and Baden-Wurttemberg. HLRS gives the architecture and schedule and promises more than seven times Hunter's performance; heise reports 1,488 MI430X GPUs and 372 Venice CPUs (two CPUs and eight GPUs per node), 432 GB HBM4 per GPU, at least 340 PFlop/s FP64 and about EUR 100 million. The counts and peak rest on heise alone, so the tier is reported and no FLOPS are recorded for a machine not yet built.
Timeline
- 2025-12-02 The University of Stuttgart and HPE announced the signed Herder contract, with delivery scheduled for the second half of 2027 source
Site & facility
HLRS, University of Stuttgart
- Location
- Stuttgart, Germany
- Cooling
- Direct liquid cooling
- Commissioned
- 1996
Change history
- 2026-10-02 Added Herder, HLRS's planned MI430X system
Related systems
Same site
- HLRS NEC SX-8 · Germany, decommissioned, 2005
- Baku (HLRS) · Germany, operational, 2009
- Hermit · Germany, decommissioned, 2011
- Hazel Hen · Germany, decommissioned, 2015
- Hawk · Germany, decommissioned, 2020
- Hunter · Germany, operational, 2025
Same operator
- HWW Stuttgart NEC SX-4/32 · Germany, operational, 1996
- HammerHAI · Germany, under construction
Same accelerator
- Alice Recoque · France, planned
- Discovery (ORNL) · USA, planned
- LUMI-AI · Finland, planned
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| heise.de | names system, part and count | AMD Instinct MI430X · counts: 1488 |
| hlrs.de | names system and part | AMD Instinct MI430X |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.