Supercomputers/Systems/ASPIRE 2B (GPU Partition)
Singapore · operational · mixed
ASPIRE 2B (GPU Partition)
Operated by National Supercomputing Centre Singapore at NSCC (Nanyang Technological University) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 66.40 PFlop/s
- Rpeak
- 106.0 PFlop/s
- Rmax ÷ Rpeak
- 62.7%
- Cores
- 239,616
- Power
- 1.66 MW
- Per watt
- 40.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ASPIRE 2B (GPU Partition), and those in Singapore. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 66.40 PFlop/s | #35 of 158 · top 22% | #1 of 9 · highest |
| Energy efficiency | 40.0 GF/W | #55 of 81 · bottom 33% | - |
| Rmax ÷ Rpeak | 62.7 % | #123 of 155 · bottom 22% | #7 of 9 · bottom 26% |
| Power draw | 1,658 kW | #22 of 85 · top 25% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE ProLiant Compute XD685 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | NVIDIA H200 SXM Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W >1,500 NVIDIA H200 GPUs | NVIDIA | - | Verified | top500.orgnscc.sg |
| CPU | AMD EPYC 9005 (Turin) CPUs x86-64 · 192C · 2.7 GHz · TSMC N3E · 500 W AMD EPYC 9655 96C 2.6GHz | AMD | - | Verified | top500.orgnscc.sg |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11, 400 Gbps | Hewlett Packard Enterprise | - | Verified | top500.orgnscc.sg |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 9.6 | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What ASPIRE 2B (GPU Partition) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Research Foundation (NRF), Singapore | 2026-06 | Press report | hpcwire.com |
| Funding programme | Part of a national investment of 270 million dollars announced by the NRF in 2024Currency not stated in the release; no cost_usd_m recorded | 2026-06 | Press report | hpcwire.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Provisioning prioritises national Research, Innovation and Enterprise programmes, with flexibility for institutional and emerging research | 2026-06 | Press report | hpcwire.commddi.gov.sg |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2026: stated peak of up to 115 PFlop/s, about four times ASPIRE 2A and 2A+ combined, with more than 1500 NVIDIA H200 GPUsLaunch speech by the Minister gives the same GPU count and 115 PFlop/s figure | 2026-06 | Press report | hpcwire.commddi.gov.sg |
The read
Launched by Singapore's Ministry of Digital Development and Information at NSCC's NTU site: a Singapore government minister's own speech states it is a hundredfold increase in compute capacity over ASPIRE 1, and that it will later link to the Quantinuum Helios quantum computer, a rare case in this dataset of a stated future quantum-classical integration path rather than a present one.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
NSCC (Nanyang Technological University)
- Location
- Singapore, Singapore
- Commissioned
- 2026
Nearby in scale
The machines closest to ASPIRE 2B (GPU Partition) by Rmax, smaller to larger.
Related systems
Same site
- ASPIRE 2B (CPU Partition) · Singapore, operational, 2026
Same operator
- ASPIRE 2A+ · Singapore, operational, 2024
- ASPIRE 2A (CPU Partition) · Singapore, operational, 2023
- ASPIRE 2A (GPU Partition) · Singapore, operational, 2023
- ASPIRE 1 · Singapore, decommissioned, 2016
Same accelerator
- Cassava AI Factory · South Africa, operational, 2026
- EYAS · Saudi Arabia, operational, 2026
- LiDO4 · Germany, operational
- Maximus-02 · USA, operational, 2026
- Nanyang Titan · Singapore, operational, 2026
- Neo · USA, operational, 2026
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA H200 SXM, AMD EPYC 9005 (Turin), HPE Slingshot-11 |
| mddi.gov.sg | names system and part | NVIDIA H200 SXM |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.