COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Condor Galaxy 1

USA · operational · ai training

Condor Galaxy 1

Operated by Cerebras at Colovore (Santa Clara) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator Cerebras CS-2 (WSE-2)
Accelerators
Cerebras (wafer-scale)
64 Cerebras CS-2 systems
Cerebras 64
reported
Verified cerebras.aig42.ai

Engineering, funding and access

What Condor Galaxy 1 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes64 nodes64 CS-2 systems; Cerebras' own blog says 32 CS-2s were running at announcement with the second phase to reach 642023-07-20Operator statedg42.aicerebras.ai
Total memory82 TBCerebras quotes 82 TB of unified memory for the cluster; the G42 page does not state memory2023-07-20Operator statedcerebras.ai
Interconnect and topologyCerebras Wafer-Scale Cluster fabric, 386 Tb/s internal bandwidth in Cerebras' blog and 388 Tb/s in G42's announcementHost processors are 72,704 AMD EPYC Gen 3 cores2023-07-20Operator statedcerebras.aig42.ai

Software

ItemDetailAs ofBasisSource
Programming and software stackCerebras Wafer-Scale Cluster with weight-streaming data-parallel training and native support for 50,000-token sequences2023-07-20Operator statedcerebras.ai

Funding

ItemDetailAs ofBasisSource
ProcurementFirst of nine planned Condor Galaxy systems built by Cerebras for G42, whose subsidiaries G42 Cloud, IIAI and G42 Health work with Cerebras; 576 CS-2s planned in total2023-07-20Operator statedg42.ai

Access

ItemDetailAs ofBasisSource
How researchers get timeCerebras Cloud (including a White Glove Service) and G42 Cloud, with dedicated supercomputing instances of 1 to 4 exaFLOPs for commercial customers2023-07-20Operator statedcerebras.ai

Results

ItemDetailAs ofBasisSource
Notable resultMed42, a clinical LLM developed with M42 and Core42, was trained on CG-1 in a weekend (Cerebras, 2024)2024-03Operator statedcerebras.ai

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 64 accelerators 2023-07 Operator stated 64 Cerebras CS-2 wafer-scale systems (one WSE-2 each), Santa Clara. Counts systems, not GPUs. cerebras.aig42.ai

The read

The first Cerebras and G42 AI supercomputer, 64 CS-2 systems in Santa Clara, announced in July 2023 with half the systems running and declared complete in November 2023. Cerebras built and operates it and G42 Cloud offers it. Both companies state the 64 systems and the site, but G42's release repeats Cerebras' text, so the tier is reported. Cerebras quotes 4 exaflops of 16-bit AI compute, an operator-stated figure on a different basis from HPL, so it is not recorded as FLOPS. Cerebras' own material gives the fabric as both 388 and 386 Tb/s. Condor Galaxy 2 and 3 are not recorded, because only one release each supports them.

Timeline

  • 2023-07 Announced source
  • 2023-07 First operational source
  • 2023-11-13 Cerebras and G42 announced CG-1 complete and broke ground on Condor Galaxy 2 source

Site & facility

Colovore (Santa Clara)

Location
Santa Clara, CA, USA
Commissioned
2023

Change history

Nearby in scale

The machines closest to Condor Galaxy 1 by accelerator count, smaller to larger.

Same site

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
cerebras.ainames system, part and countCerebras CS-2 (WSE-2) · counts: 64
g42.aiblocked our fetch-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading