Supercomputers/Systems/Dragão
Brazil · operational · hpc
Dragão
Operated by Petrobras .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 8.98 PFlop/s
- Rpeak
- 14.01 PFlop/s
- Rmax ÷ Rpeak
- 64.1%
- Cores
- 188,224
- Power
- 943.12 kW
- Per watt
- 9.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Dragão, and those in Brazil. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 8.98 PFlop/s | #72 of 210 · top 34% | #4 of 19 · top 17% |
| Energy efficiency | 9.5 GF/W | #58 of 109 · bottom 48% | #6 of 11 · top 50% |
| Rmax ÷ Rpeak | 64.1 % | #153 of 207 · bottom 27% | #10 of 16 · bottom 41% |
| Power draw | 943 kW | #42 of 112 · top 37% | #3 of 11 · top 20% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Atos (listed by TOP500 as Bull) | Atos | - | Reported | baguete.com.brtop500.org |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W NVIDIA Tesla V100 | NVIDIA | - | Reported | top500.org |
| CPU | - Intel Xeon Gold 6230R 26C 2.1GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds Infiniband EDR | NVIDIA | - | Reported | top500.org |
| Operating system | CentOS Operating systems Linux distribution, RHEL-compatible rebuild · Open source, community-maintained CentOS Linux 7 | The CentOS Project | - | Reported | top500.org |
Engineering, funding and access
What Dragão runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 200 TBStated as 200 TB of RAM | 2021-07 | Press report | baguete.com.br |
| Interconnect and topology | InfiniBand EDR (Baguete describes a 100 Gbit/s network) | 2021-07 | Operator stated | top500.orgbaguete.com.br |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | CentOS Linux 7, GNU C/C++ 4.8.5, Intel MKL and Open MPI 3.1.3 for the TOP500 run | 2026-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Atos contracted by Petrobras to implement the system, with R$100 million of investment; assembly took about three months and the hardware weighs 20 tonnes over 34 metres of racksCost given in reais only | 2021-07 | Press report | baguete.com.br |
The read
Petrobras's seismic-imaging supercomputer, implemented by Atos from the second half of 2021 for pre-salt subsurface imaging and billed as the largest system in Brazil at launch, ahead of the company's older Atlas and Fenix. TOP500 lists it as a Bull system with Xeon Gold 6230R 26C 2.1GHz hosts, NVIDIA Tesla V100 accelerators and InfiniBand EDR under CentOS 7, with 188,224 cores, Rmax 8.98 PFlop/s, Rpeak 14.01 PFlop/s and 943 kW. Its best TOP500 rank was 46th on the June 2021 list, and it was still listed in June 2026 at 206th. The Baguete report gives R$100 million of investment and 200 TB of RAM but no GPU count, so no quantity is recorded. Petrobras's later Harpia and Pegasus systems sit alongside it; the installation site is not stated, so it is left unlocated.
Timeline
- 2021 First operational source
- 2021-06 Listed at #46 on the TOP500 (June 2021) source
- 2021-07 Petrobras and Atos announced the new seismic-imaging supercomputer, with operations expected to start in the second half of 2021. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Dragao, the Petrobras seismic-imaging system, 46th on the June 2021 TOP500
Nearby in scale
The machines closest to Dragão by Rmax, smaller to larger.
- Tillicum · USA, operational · 8.85 PFlop/s
- Nanyang Titan · Singapore, operational · 8.8 PFlop/s
- Raven-GPU · Germany, operational · 8.62 PFlop/s
- Taiwania 2 · Taiwan, operational · 9 PFlop/s
- Aitken · USA, operational · 9.07 PFlop/s
- Goethe-NHR · Germany, operational · 9.09 PFlop/s
Related systems
Same operator
- Atlas (Petrobras) · Brazil, operational, 2020
- Fênix · Brazil, operational, 2019
- Gemini (Petrobras) · Brazil, operational, 2023
- Harpia · Brazil, operational, 2025
- Grifo06 · Brazil, operational, 2013
- Grifo04 · Brazil, operational, 2012
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA Tesla V100, Mellanox InfiniBand EDR, CentOS |
| baguete.com.br | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.