COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Edison

USA · decommissioned · hpc

Edison

Operated by Lawrence Berkeley National Laboratory at NERSC, Shyh Wang Hall .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.65 PFlop/s
HPL measured
Rpeak
2.57 PFlop/s
Rmax ÷ Rpeak
64.4%
Cores
133,824
Power
3.75 MW
Per watt
0.4 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Edison, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.65 PFlop/s#45 of 245 · top 18%#155 of 332 · top 47%
Energy efficiency0.4 GF/W#192 of 198 · bottom 4%#132 of 162 · bottom 20%
Rmax ÷ Rpeak64.4 %#199 of 243 · bottom 19%#251 of 331 · bottom 25%
Power draw3,747 kW#11 of 199 · top 5%#20 of 171 · top 11%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Cray XC30
Cray - Reported top500.org
Interconnect Cray Aries
Interconnect
Dragonfly · About 10 GB/s per direction · Around 1 microsecond
Cray Aries Dragonfly interconnect
Cray - Reported top500.org
Operating system Cray Linux Environment
Operating systems
Linux, Cray-customised · Proprietary layer over open-source Linux
Cray Linux Environment
Cray - Reported top500.org

Engineering, funding and access

What Edison runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes5,586 nodes30-cabinet Cray XC30, 24 cores and 64 GB per node. NERSC cites 134,064 cores; TOP500 lists 133,824.2019-05Operator statednersc.gov
Storage capacity7.56 PBScratch file system.2019-05Operator statednersc.gov
Interconnect and topologyCray Aries dragonflyOne of the first Cray Cascade systems.2019-05Operator statednersc.gov

Funding

ItemDetailAs ofBasisSource
Funded byUS Department of Energy Office of Science (via NERSC)2019-05Operator statednersc.gov
ProcurementMost hardware was returned to Cray under the NERSC-9 agreement after retirement; test system, login nodes and part of the cooling system kept2019-05Operator statednersc.gov

The read

NERSC's Cray XC30, opened for production on 14 January 2014 and retired on 13 May 2019 according to NERSC's own retirement article, which is where both dates come from. It ranked 19th in June 2014. NERSC says 134,064 cores and TOP500 says 133,824; TOP500's is used and the difference is left open. Rmax rests on TOP500 alone.

Timeline

  • 2014-01 First operational source
  • 2014-06 Listed at #19 on the TOP500 (June 2014) source
  • 2019-05 Retired to free facility power for NERSC-9 Perlmutter, with most hardware returned to Cray under the NERSC-9 agreement source
  • 2019-05 Decommissioned source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

NERSC, Shyh Wang Hall

Location
Berkeley, CA, USA
Cooling
Direct liquid cooling with cooling towers
Commissioned
2015

Where sources disagree

We record conflicts instead of picking a winner quietly. All open questions.

Change history

Nearby in scale

The machines closest to Edison by Rmax, smaller to larger.

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
nersc.govnames system and partCray Aries
top500.orgnames system and partCray Aries, Cray Linux Environment

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.