COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Serbia National AI Platform

Serbia · operational · ai training

Serbia National AI Platform

Also known as Kragujevac AI Supercomputer

Operated by Office for IT and eGovernment of Serbia at State Data Centre Kragujevac .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
New supercomputer with 48 graphics cards supplied by Eviden, about 5 million euros, launched 30 April 2026
Eviden
ATOEPA rolls up to Atos
- Reported rts.rs
Accelerator NVIDIA A100 (in DGX A100)
Accelerators
4 NVIDIA DGX A100 systems with 32 GPUs, 1,024 processor threads, 150 TB storage
NVIDIA 32
reported
Reported ite.gov.rs
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
6 NVIDIA DGX H200 systems with 48 GPUs
NVIDIA 48
reported
Reported ite.gov.rsrts.rs

Engineering, funding and access

What Serbia National AI Platform runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Storage capacity150 TBOriginal 2021 DGX A100 system; the same page says the H200 upgrade adds 120 TB.2025Operator statedite.gov.rs

Funding

ItemDetailAs ofBasisSource
Funded byGovernment of Serbia (decided to buy the upgrade; amount not stated on the page)2025Operator statedite.gov.rs
ProcurementNew Eviden-built supercomputer with 48 GPUs valued at about 5 million euros, linked to the 2021 machine and put into operation 30 April 2026The ITE page describes the upgrade as six NVIDIA DGX H200 systems with 48 GPUs; RTS names Eviden as manufacturer, so the two descriptions are not reconciled.2026-04Press reportrts.rsite.gov.rs

Access

ItemDetailAs ofBasisSource
How researchers get timeFree of charge for universities, scientific institutes, faculties and domestic start-ups in science and technology parksThe page does not describe an application procedure.2025Operator statedite.gov.rs

The read

Serbia's National Platform for Artificial Intelligence, hosted in the Government Data Centre in Kragujevac and provided free of charge to universities, scientific institutes and start-ups. The Office for IT and eGovernment describes the original system as 4 NVIDIA DGX A100 nodes with 32 GPUs, 1,024 processor threads and 150 TB of storage (5 PFlops of AI performance), bought in 2021, and an upgrade of six NVIDIA DGX H200 systems with 48 GPUs and 120 TB of additional storage (32 PFlops of AI performance). RTS reported the new Eviden-built supercomputer with 48 graphics cards, valued at about 5 million euros, being put into operation on 30 April 2026 alongside the 2021 machine, with a third, roughly 50 million euro supercomputer planned for late 2026. The PFlops figures are vendor AI-precision numbers and are not recorded as FLOPS here; the government page and the broadcaster are independent but differ on the exact upgrade year, so confidence is reported.

Timeline

  • 2026-04-30 A new Eviden-built supercomputer with 48 GPUs, valued at about 5 million euros, is put into operation at the State Data Centre in Kragujevac with President Vucic present. source

Site & facility

State Data Centre Kragujevac

Location
Kragujevac, Serbia

Change history

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
ite.gov.rsnames system, part and countNVIDIA A100 (in DGX A100), NVIDIA H200 SXM · counts: 32, 48
rts.rsdoes not name this system · counts: 48

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading