COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Lynx (Arizona)

USA · planned · mixed

Lynx (Arizona)

Also known as UArizona Lynx

Operated by University of Arizona .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
11,136
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo V3 servers bought in 2026
Lenovo - Reported hpcdocs.hpc.arizona.edu
Accelerator -
40 NVIDIA H200 GPUs, 8 per GPU node
NVIDIA 40
reported
Reported hpcdocs.hpc.arizona.edu
CPU -
AMD EPYC Turin 9655 and 9455 CPUs, 11,136 schedulable cores in total
AMD - Reported hpcdocs.hpc.arizona.edu
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
NDR InfiniBand for MPI
NVIDIA - Reported hpcdocs.hpc.arizona.edu

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 40 accelerators 2026-10 Design target Planned 40 NVIDIA H200 GPUs; the cluster is being acquired and is not yet available. hpcdocs.hpc.arizona.edu

The read

University of Arizona's next HPC cluster, which the research computing documentation says it is in the process of acquiring and which is not yet available. Planned hardware on that page: Lenovo V3 servers bought in 2026 with 55 CPU-only nodes, 5 GPU nodes and 1 high-memory node (11,136 cores in total, AMD EPYC Turin 9655 and 9455 CPUs), 40 NVIDIA H200 GPUs (eight per node), 41.4 TB of memory and NDR InfiniBand for MPI. The page says MIG partitioning of the H200s may be provisioned depending on test results. No FLOPS figure is published.

Timeline

No dated events recorded.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.

Cited sourceResultFound on the page
hpcdocs.hpc.arizona.edudoes not name this system-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading