Supercomputers/Systems/fortytwo
Germany · operational · ai training
fortytwo
Also known as hessian.AI 42; hessian.AI fortytwo
Operated by hessian.AI at GSI Helmholtz Centre (Darmstadt) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 7.94 PFlop/s
- Rpeak
- 8.83 PFlop/s
- Rmax ÷ Rpeak
- 89.9%
- Cores
- 64,512
- Power
- 352.8 kW
- Per watt
- 22.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of fortytwo, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 7.94 PFlop/s | #147 of 257 · bottom 44% | #18 of 95 · top 18% |
| Energy efficiency | 22.5 GF/W | #83 of 135 · bottom 40% | #20 of 68 · top 28% |
| Rmax ÷ Rpeak | 89.9 % | #19 of 256 · top 7% | #9 of 94 · top 9% |
| Power draw | 353 kW | #84 of 139 · bottom 41% | #43 of 69 · bottom 39% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Apollo 6500 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | - 632 NVIDIA A100 80GB GPUs | NVIDIA | 632 reported | Verified | hessian.aitop500.org |
| Accelerator | Graphcore IPU Accelerators Graphcore IPU · TSMC 7nm · 300 W Four Graphcore IPU units | Graphcore | 4 reported | Reported | hessian.ai |
| CPU | - AMD EPYC 7313 16C 3GHz | AMD | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds Infiniband HDR (NVIDIA Quantum) | NVIDIA | - | Reported | top500.orghessian.ai |
Engineering, funding and access
What fortytwo runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 80 nodesCompute nodes of the HPE Apollo 6500 based system | 2023-06 | Operator stated | hessian.ai |
| Storage capacity | 1.2 PBCentral flash storage | 2023-06 | Operator stated | hessian.ai |
| Interconnect and topology | NVIDIA Quantum InfiniBand (HDR per TOP500), NVLink within nodes | 2023-06 | Operator stated | hessian.aitop500.org |
| Cooling design | Cooling energy is less than 7 percent of the electrical power used for computing; housed in the Green IT Cube | 2023-06 | Operator stated | hessian.ai |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | IBM Spectrum Scale on 1.2 PB central flash storage, served over the same InfiniBand network | 2023-06 | Operator stated | hessian.ai |
| Programming and software stack | RHEL 8.7, OpenMPI 4.1.5, Intel MKL and cuBLAS (HPL run configuration) | 2025-11 | Operator stated | top500.org |
| Programming and software stack | HPE Machine Learning Development Environment | 2023-06 | Operator stated | hessian.ai |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Three Hessian ministries (Science and the Arts; Digital Strategy and Development; Economics, Energy, Transport and Housing) | 2023-06 | Operator stated | hessian.ai |
| Funded by | German Federal Ministry of Education and Research (BMBF) | 2023-06 | Operator stated | hessian.ai |
| Funding programme | BMBF AI Service Centers funding line with Hessian state co-fundingProject cost stated as 14.5 million with the currency not given on the page, so no cost row is added | 2023-06 | Operator stated | hessian.ai |
| Procurement | HPE Apollo 6500 based system including the HPE Machine Learning Development Environment, announced 15 June 2023 | 2023-06 | Operator stated | hessian.ai |
The read
The AI supercomputer of the Hessian Center for Artificial Intelligence (hessian.AI), announced on 15 June 2023 and housed in the Green IT Cube on the GSI/FAIR campus in Darmstadt. hessian.AI describes 80 compute nodes with 632 NVIDIA A100 80GB GPUs plus four Graphcore IPU units, an NVIDIA Quantum InfiniBand network and 1.2 PB of flash storage (IBM Spectrum Scale), with cooling under seven percent of the electrical power used for computing. TOP500 lists it as an HPE Apollo 6500 with AMD EPYC 7313 hosts, 64,512 cores, Rmax 7.94 PFlop/s, Rpeak 8.83 PFlop/s and 352.8 kW. It ranked 98th on the November 2023 list; the June 2024 to November 2025 lists carry it at 120th, 146th, 174th and 204th.
Timeline
- 2023 First operational source
- 2023-06-15 Announced source
- 2023-11 Listed at #98 on the TOP500 (November 2023) source
- 2023-11 fortytwo debuted on the TOP500 at rank 98, then slipped to rank 228 by the June 2026 list. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added fortytwo, the hessian.AI A100 supercomputer in Darmstadt, 98th on the November 2023 TOP500
Nearby in scale
The machines closest to fortytwo by Rmax, smaller to larger.
Related systems
Same site
- fortythree · Germany, operational, 2024
- GSI Virgo Cluster · Germany, operational, 2020
- L-CSC · Germany, operational, 2014
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hessian.ai | names system, part and count | Graphcore IPU, NVIDIA InfiniBand HDR · counts: 4 |
| top500.org | does not name this system | NVIDIA InfiniBand HDR · counts: 4 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.