Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Elea builds and operates BEL1 with AXIA Energia supplying renewable power | Elea Data Centers | - | Reported | eleadatacenters.comdatacenterknowledge.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Facility power | 7.5 MW | 2026-06 | Design target | Initial capacity; up to 100 MW possible in later phases. IT versus total not stated | eleadatacenters.comdatacenterknowledge.com |
The read
Elea Data Centers' BEL1 in Belem, Para, announced as the Amazon region's first 'AI neutral' data center: 7.5 MW initial capacity, already backed by large anchor clients, with up to 100 MW possible in later phases and operations scheduled for the second quarter of 2027. It sits near AXIA Energia's Miramar high-voltage substation and will buy 100 percent renewable energy from AXIA under a PPA. The project grew from Belem's role as COP30 host. No accelerator vendor, count or tenant is named. Elea's much larger Rio plan is `elea-rio-ai-city`.
Timeline
- 2026-06-26 Announced source
Site & facility
Elea BEL1 Site (Belem)
- Location
- Belem, Brazil
- Utility
- AXIA Energia (Miramar substation)
Change history