Supercomputers/Systems/Xingrui Intelligent Computing Center
China · operational · mixed
Xingrui Intelligent Computing Center
Operated by Geely at Xingrui Intelligent Computing Center (Huzhou) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 23.50 EFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Geely built and operates Xingrui in-house as a cloud-data-AI supercomputing platform for intelligent driving, connectivity and R&D workloads across its brands | Geely | - | Reported | marklines.comautonews.gasgoo.com |
The read
Geely's cloud-data-AI supercomputing platform in Changxing County, Huzhou, Zhejiang, which Geely describes as the first such integrated center built by a global automaker. It went online 28 January 2023 and was formally inaugurated 27 February 2023; MarkLines and Gasgoo, two independent automotive-industry trade outlets, agree on the Huzhou location and the January/February 2023 dates. The aggregate computing-power figure has been restated upward several times in Geely's own announcements as the center expanded: about 1.02 exaflops as of a January 2025 company statement, and 23.5 EFLOPS as of an April 2026 Geely press release (distributed via GlobeNewswire) describing it as the largest such facility among Chinese automakers. None of the PFLOPS/EFLOPS figures were independently confirmed by a source other than Geely itself, so flops_basis is operator_stated and confidence is reported rather than verified, despite the location and timeline being independently corroborated. No GPU model, node count or power draw was disclosed in the sources fetched.
Site & facility
Xingrui Intelligent Computing Center (Huzhou)
- Location
- Huzhou, China
- Commissioned
- 2023
Change history
- 2026-09-27 Xingrui Intelligent Computing Center added, Geely's cloud-data-AI supercomputing platform in Huzhou
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| autonews.gasgoo.com | names system only | - |
| marklines.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.