COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/JADE2

United Kingdom · operational · mixed

JADE2

Also known as Joint Academic Data Science Endeavour 2

Operated by University of Oxford at Hartree Centre Supercomputing Centre (Daresbury) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.47 PFlop/s
HPL measured
Rpeak
3.93 PFlop/s
Rmax ÷ Rpeak
37.4%
Cores
42,840
Power
113 kW
Per watt
13.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of JADE2, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.47 PFlop/s#197 of 213 · bottom 9%#20 of 44 · top 44%
Energy efficiency13.0 GF/W#47 of 116 · top 40%#5 of 21 · top 20%
Rmax ÷ Rpeak37.4 %#207 of 209 · bottom 2%#42 of 44 · bottom 6%
Power draw113 kW#104 of 118 · bottom 13%#20 of 21 · bottom 6%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Atos (Bull) with NVIDIA DGX-1 MaxQ nodes, 63 DGX nodes
Atos - Reported oerc.ox.ac.uktop500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
504 NVIDIA V100 Tensor Core GPUs (V100 SXM2)
NVIDIA 504
reported
Verified oerc.ox.ac.uktop500.org
CPU -
Xeon E5-2698v4 20C 2.2GHz
Intel - Reported top500.org
Interconnect -
Mellanox InfiniBand (HDR per TOP500)
NVIDIA - Verified oerc.ox.ac.uktop500.org

Engineering, funding and access

What JADE2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes63 nodesNVIDIA DGX nodes with 504 V100 Tensor Core GPUs in total2020Operator statedoerc.ox.ac.uk
Interconnect and topologyMellanox HDR InfiniBandTOP500 list entry; the Oxford case study says NVIDIA Mellanox InfiniBand without naming the generation2020-11Operator statedtop500.orgoerc.ox.ac.uk

Software

ItemDetailAs ofBasisSource
Parallel filesystemDDN A3I storage solution built on DDN AI4002020Operator statedoerc.ox.ac.uk
Programming and software stackLinux; the TOP500 HPL run used Intel compilers, MKL and Intel MPITOP500 list entry2020-11Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funded byEngineering and Physical Sciences Research Council (EPSRC)2020Operator statedoerc.ox.ac.uk
ProcurementFour-year contract with Atos worth GBP 5 millionJADE2 more than triples JADE1's capacity and serves a consortium of over twenty universities plus the Alan Turing Institute2020Operator statedoerc.ox.ac.uk

The read

The EPSRC-funded national GPU facility for machine learning and molecular dynamics, led from the Oxford e-Research Centre and run at the STFC Hartree Centre in Daresbury. The Oxford case study lists 63 DGX nodes with 504 NVIDIA V100 GPUs, Mellanox InfiniBand and DDN AI400 storage under a GBP 5 million four-year Atos contract; TOP500 lists it as a Bull system built on NVIDIA DGX-1 MaxQ nodes with Xeon E5-2698v4 20C hosts, V100 SXM2 GPUs and Mellanox HDR InfiniBand at 1.47 PFlop/s Rmax, 3.93 PFlop/s Rpeak and 113 kW. Its only TOP500 entry is November 2020 (456th), when it was 16th on the Green500 at 13.035 GFlops/Watt. Later status is not documented, so the row is carried as of that list.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Hartree Centre Supercomputing Centre (Daresbury)

Location
Daresbury, Cheshire, United Kingdom
Cooling
Direct liquid cooling (warm water)
Commissioned
2025

Change history

Nearby in scale

The machines closest to JADE2 by Rmax, smaller to larger.

  • Satori (MIT) · USA, operational · 1.46 PFlop/s
  • Salomon · Czechia, decommissioned · 1.46 PFlop/s
  • JURECA · Germany, decommissioned · 1.42 PFlop/s
  • Grizzly · USA, operational · 1.52 PFlop/s
  • State Grid SGSystem · China, operational · 1.56 PFlop/s
  • Cygnus · Japan, decommissioned · 1.58 PFlop/s

Same site

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
oerc.ox.ac.uknames system only · counts: 504
top500.orgnames system and partNVIDIA Tesla V100

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.