COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/HPC5

Italy · operational · hpc

HPC5

Operated by Eni at Eni Green Data Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
35.45 PFlop/s
HPL measured
Rpeak
51.72 PFlop/s
Rmax ÷ Rpeak
68.5%
Cores
669,760
Power
2.25 MW
Per watt
15.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of HPC5, and those in Italy. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax35.45 PFlop/s#11 of 213 · top 5%#4 of 21 · top 15%
Energy efficiency15.7 GF/W#38 of 116 · top 32%#5 of 14 · top 31%
Rmax ÷ Rpeak68.5 %#105 of 209 · top 50%#12 of 20 · bottom 43%
Power draw2,252 kW#12 of 118 · top 9%#5 of 14 · top 31%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C4140
Dell Technologies - Verified top500.orgeni.com
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
four NVIDIA V100 per node, 1,820 nodes
NVIDIA 7,280
estimated
Verified industriaitaliana.itinno3.it
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Mellanox HDR InfiniBand 200 Gb/s, full non-blocking
NVIDIA - Verified inno3.ittop500.org
Operating system CentOS
Operating systems
Linux distribution, RHEL-compatible rebuild · Open source, community-maintained
CentOS Linux 7
The CentOS Project
IBMNYSE rolls up to IBM
- Reported top500.org

Engineering, funding and access

What HPC5 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyMellanox HDR InfiniBand2020-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackCentOS Linux 7 (as submitted for the TOP500 HPL run)2020-06Operator statedtop500.org

Results

ItemDetailAs ofBasisSource
Notable result2020: ranked 6th on the June 2020 TOP500 at 35.45 PFlop/s; Eni called it the most powerful supercomputer infrastructure for industrial use2020-06Operator statedeni.comtop500.org

The read

Eni's Dell PowerEdge system of 1,820 nodes, each with two Xeon Gold CPUs and four NVIDIA V100 GPUs, presented in February 2020 and sixth on the June 2020 TOP500. Eni and two Italian trade pages independently give the hardware, so those edges are verified; TOP500 is the only source for Rmax, Rpeak and cores. The GPU count is our arithmetic from the node count, so it is marked estimated.

Timeline

  • 2020 First operational source
  • 2020-06 Listed at #6 on the TOP500 (June 2020) source
  • 2020-06 HPC5 debuted at rank 6 on the June 2020 TOP500 at 35.45 PFlop/s source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Eni Green Data Center

Location
Ferrera Erbognone, Italy

Change history

Nearby in scale

The machines closest to HPC5 by Rmax, smaller to larger.

Same site

  • HPC4 · Italy, operational, 2018
  • HPC6 · Italy, operational, 2024
  • HPC2 · Italy, operational, 2014
  • HPC7 · Italy, operational, 2026

Same operator

  • HPC1 · Italy, operational, 2013

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
eni.comnames system only-
top500.orgnames system and partNVIDIA Tesla V100, NVIDIA InfiniBand HDR, CentOS

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.