COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Companies/BlackChamber Group

Washington, DC, USA

BlackChamber Group

Washington, D.C. developer, through its affiliate Black Chamber Partners, of the data center side of the Cedar Creek campus in Bastrop County, Texas.

Systems this company appears in

Systems
1
Aggregate Rmax
none published
systems it appears in
Aggregate power
0 kW
where disclosed
First appearance
-
Most recent
-
Concentration
-
largest is Cedar Creek Campus (Bastrop County)

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Integrator 1 none published

Appearances

System Supplied as Shipped under Rmax Rank
Cedar Creek Campus (Bastrop County)
USA ·
Integrator BlackChamber Group - unranked

AI datacenters operated

SystemStatusAcceleratorsStated power (MW)
Cedar Creek Campus (Bastrop County) planned - 490

Figures come from the AI datacenter metrics; blank means none recorded.

Sites operated

Site Location Cooling Commissioned
Cedar Creek Site (Bastrop County) Cedar Creek, TX, USA - -

Further reading