Supercomputers/Systems/Setonix
Australia · operational · hpc
Setonix
Quantum: linked to Quantum Brilliance Pawsey Accelerator (2 other qubits)
Also known as Setonix - GPU
Operated by Pawsey Supercomputing Research Centre at Pawsey Supercomputing Research Centre .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 27.16 PFlop/s
- Rpeak
- 35.00 PFlop/s
- Rmax ÷ Rpeak
- 77.6%
- Cores
- 181,248
- Power
- 476.63 kW
- Per watt
- 57.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Setonix, and those in Australia. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 27.16 PFlop/s | #44 of 246 · top 18% | #1 of 12 · highest |
| Energy efficiency | 57.0 GF/W | #18 of 130 · top 13% | - |
| Rmax ÷ Rpeak | 77.6 % | #80 of 243 · top 33% | #8 of 12 · bottom 37% |
| Power draw | 477 kW | #72 of 133 · bottom 47% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX235a | Hewlett Packard Enterprise | - | Verified | top500.orgpawsey.org.au |
| Accelerator | AMD Instinct MI250X Accelerators ROCm (CDNA 2) · 1.7 GHz · TSMC N6 · 560 W AMD Instinct MI250X | AMD | - | Verified | top500.orgpawsey.org.au |
| CPU | AMD EPYC 7A53 (Trento) CPUs x86-64 · 64C · 2 GHz · 7 nm · 280 W AMD Optimized 3rd Generation EPYC 64C 2GHz | AMD | - | Verified | top500.orgpawsey.org.au |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Verified | top500.orgpawsey.org.au |
| Operating system | HPE Cray Operating System Operating systems SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux HPE Cray OS | Hewlett Packard Enterprise | - | Reported | top500.org |
Engineering, funding and access
What Setonix runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,792 nodes1584 + 16 dual-socket Milan CPU nodes and 192 MI250X GPU nodes (whole Setonix system); the TOP500 entry covers only the GPU partition | 2025 | Operator stated | pawsey.org.au |
| Total memory | 463 TBPawsey states 463 TB RAM; a 2021 press report anticipated over 548 TB including GPU memory | 2025 | Operator stated | discover.pawsey.org.au |
| Storage capacity | 14 PBLustre /scratch, 3 PB SSD and 11 PB HDD | 2025 | Operator stated | pawsey.org.au |
| Interconnect and topology | HPE Slingshot, 200 Gb/s per node, 800 Gb/s into GPU nodes | 2025 | Operator stated | pawsey.org.auhi-network.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre for /scratch (14 PB) and /software, NFS for /home | 2025 | Operator stated | pawsey.org.au |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Australian Government (National Collaborative Research Infrastructure Strategy)Pawsey states it is supported by $90 million from the Australian Government; share for Setonix not given | 2025 | Operator stated | pawsey.org.au |
| Funding programme | Pawsey Capital Refresh Program, delivered under a AU$70 million Australian Government grant announced in 2018 | 2021-09 | Press report | hi-network.com |
| Procurement | HPE awarded the AU$48 million Setonix contract in October 2020 after a tender; stage one unveiled 2021-09-20 | 2021-09 | Press report | hi-network.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Ranked fourth on the Green500 list, described by Pawsey as the most powerful research computer in the Southern Hemisphere | 2025 | Operator stated | discover.pawsey.org.aupawsey.org.au |
The read
The GPU (accelerated) partition of Pawsey's Setonix, an HPE Cray EX / AMD MI250X / Slingshot-11 national research system in Western Australia. Pawsey's own SC22 announcement states an efficiency of 56.983 GFlops/watt, which multiplied out against its own 476.63 kW power figure reproduces TOP500's 27.16 Pflops Rmax almost exactly, an independent mathematical confirmation of both figures, not merely a restatement of TOP500's own numbers.
Timeline
- 2020-10 HPE was awarded the AU$48 million contract to build Setonix for Pawsey source
- 2021-09-20 Pawsey unveiled stage one of Setonix source
- 2022 First operational source
- 2022-11 Announced source
- 2023-11 Listed at #4 on the Green500 (November 2023) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Pawsey Supercomputing Research Centre
- Location
- Kensington, Australia
- Commissioned
- 2022
Change history
- 2026-09-22 Gained a Green500 rank pointer (#4 on the 2023-11 list)
Nearby in scale
The machines closest to Setonix by Rmax, smaller to larger.
- Discovery 5 · USA, operational · 26.13 PFlop/s
- Polaris · USA, operational · 25.81 PFlop/s
- SSC-21 · South Korea, operational · 25.18 PFlop/s
- PITAGORA · Italy, operational · 27.9 PFlop/s
- Crossroads · USA, operational · 30.03 PFlop/s
- Voyager-EUS2 · USA, operational · 30.05 PFlop/s
Related systems
Same site
- Garrawarla · Australia, operational, 2020
- Topaz · Australia, decommissioned, 2020
- Magnus · Australia, decommissioned, 2014
- Galaxy · Australia, operational, 2013
Same operator
- Epic (iVEC) · Australia, operational, 2010
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| pawsey.org.au | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Cray Operating System |
| top500.org | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Slingshot-11, HPE Cray Operating System |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.