Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 46.10 PFlop/s
- Rpeak
- 61.61 PFlop/s
- Rmax ÷ Rpeak
- 74.8%
- Cores
- 319,072
- Power
- 921.48 kW
- Per watt
- 50.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX235a | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | AMD Instinct MI250X Accelerators ROCm (CDNA 2) · 1.7 GHz · TSMC N6 · 560 W AMD Instinct MI250X | AMD | - | Verified | top500.orggenci.fr |
| CPU | AMD EPYC 7A53 (Trento) CPUs x86-64 · 64C · 2 GHz · 7 nm · 280 W AMD Optimized 3rd Generation EPYC 64C 2GHz | AMD | - | Verified | top500.orgdci.dci-gitlab.cines.fr |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Verified | top500.orggenci.fr |
| Operating system | HPE Cray Operating System Operating systems SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux HPE Cray OS | Hewlett Packard Enterprise | - | Reported | top500.org |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| PUE | 1.1 | 2021-11 | Design target | GENCI 2021 contract release: HPE solution with hot-water cooling and a PUE of 1.10. Contract design figure, not metered. | genci.fr |
The read
GENCI-funded, CINES-operated, following the same funder/host split already recorded for Jean Zay (GENCI/IDRIS): CINES is recorded here as a site under GENCI rather than as its own company row. GENCI's and CINES's own announcements independently confirm the MI250X/Trento/Slingshot-11 hardware, but neither states a Linpack figure matching TOP500's own GPU-partition-only Rmax, so this row's performance numbers stay TOP500-sourced.
Timeline
- 2021-11 Announced source
- 2022 First operational source
- 2023-11 List debut at #3 (November 2023) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#3 on the 2023-11 list)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Slingshot-11, HPE Cray Operating System |
| genci.fr | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Cray Operating System |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.