Supercomputers/Systems/Adastra
France · operational · hpc
Adastra
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 46.10 PFlop/s
- Rpeak
- 61.61 PFlop/s
- Rmax ÷ Rpeak
- 74.8%
- Cores
- 319,072
- Power
- 921.48 kW
- Per watt
- 50.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Adastra, and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 46.10 PFlop/s | #27 of 246 · top 11% | #3 of 52 · top 4% |
| Energy efficiency | 50.0 GF/W | #27 of 130 · top 20% | #6 of 42 · top 12% |
| Rmax ÷ Rpeak | 74.8 % | #105 of 243 · top 43% | #31 of 51 · bottom 41% |
| Power draw | 921 kW | #49 of 133 · top 36% | #17 of 42 · top 39% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX235a | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | AMD Instinct MI250X Accelerators ROCm (CDNA 2) · 1.7 GHz · TSMC N6 · 560 W AMD Instinct MI250X | AMD | - | Verified | top500.orggenci.fr |
| CPU | AMD EPYC 7A53 (Trento) CPUs x86-64 · 64C · 2 GHz · 7 nm · 280 W AMD Optimized 3rd Generation EPYC 64C 2GHz | AMD | - | Verified | top500.orgdci.dci-gitlab.cines.fr |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Verified | top500.orggenci.fr |
| Operating system | HPE Cray Operating System Operating systems SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux HPE Cray OS | Hewlett Packard Enterprise | - | Reported | top500.org |
Engineering, funding and access
What Adastra runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 26 PBHPE Cray ClusterStor E1000: nearly 2 PB flash tier at 1.3 TB/s and 24 PB fast disk tier at 250 GB/s | 2021-11 | Operator stated | genci.fr |
| Interconnect and topology | HPE Slingshot-11, 200 Gb/s links (one per scalar node, four per accelerated node) | 2021-11 | Operator stated | genci.frtop500.org |
| Cooling design | Hot-water liquid cooling removing 97% of the heat generated | 2021-11 | Operator stated | genci.fr |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre on HPE Cray ClusterStor E1000, two tiers (flash and fast disk) | 2021-11 | Operator stated | genci.fr |
| Programming and software stack | HPE Cray OS, g++ 7.5, hipcc 5.0.2 and HPE Cray MPI (as submitted for the TOP500 HPL run) | 2022-06 | Operator stated | top500.org |
| Programming and software stack | AMD ROCm with HIP and OpenMP offload, targeted by a two-year HPE and AMD progress contract for porting applications | 2021-11 | Operator stated | genci.fr |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | GENCI selected HPE and AMD after an 18-month open competitive dialogue; two-year progress contract began November 2021; accelerated partition spring 2022, full system Q4 2022 | 2021-11 | Operator stated | genci.fr |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Open academic and industrial research; CINES operates it on behalf of the Conference des Presidents d'Universites | 2021-11 | Operator stated | genci.fr |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| PUE | 1.1 | 2021-11 | Design target | GENCI 2021 contract release: HPE solution with hot-water cooling and a PUE of 1.10. Contract design figure, not metered. | genci.fr |
The read
GENCI-funded, CINES-operated, following the same funder/host split already recorded for Jean Zay (GENCI/IDRIS): CINES is recorded here as a site under GENCI rather than as its own company row. GENCI's and CINES's own announcements independently confirm the MI250X/Trento/Slingshot-11 hardware, but neither states a Linpack figure matching TOP500's own GPU-partition-only Rmax, so this row's performance numbers stay TOP500-sourced.
Timeline
- 2021-11 Announced source
- 2021-11 GENCI began a two-year progress contract with HPE and AMD ahead of Adastra delivery source
- 2022 First operational source
- 2022-06 Adastra debuted at rank 10 on the June 2022 TOP500 at 46.10 PFlop/s source
- 2023-11 Listed at #3 on the Green500 (November 2023) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#3 on the 2023-11 list)
Nearby in scale
The machines closest to Adastra by Rmax, smaller to larger.
- Ubilink H100 Cluster · Taiwan, operational · 45.82 PFlop/s
- Reindeer · USA, operational · 45.59 PFlop/s
- JUWELS Booster · Germany, operational · 44.12 PFlop/s
- ISEG · Netherlands, operational · 46.54 PFlop/s
- FPT AI Factory Vietnam · Vietnam, operational · 46.65 PFlop/s
- Miyabi · Japan, operational · 46.8 PFlop/s
Related systems
Same site
- Adastra 2 · France, operational, 2024
- Occigen2 · France, decommissioned, 2017
- Occigen · France, upgraded, 2014
- Jade (CINES) · France, decommissioned, 2008
Same operator
- Jean Zay H100 · France, operational, 2024
- Jean Zay V100 · France, operational, 2019
- Turing (IDRIS) · France, decommissioned, 2012
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Slingshot-11, HPE Cray Operating System |
| genci.fr | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Cray Operating System |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.