COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Mahti

Finland · decommissioned · hpc

Mahti

Operated by CSC at CSC (Mahti site) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.39 PFlop/s
HPL measured
Rpeak
7.06 PFlop/s
Rmax ÷ Rpeak
76.3%
Cores
169,728
Power
1.07 MW
Per watt
5.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Mahti, and those in Finland. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax5.39 PFlop/s#84 of 213 · top 39%-
Energy efficiency5.0 GF/W#71 of 116 · bottom 40%-
Rmax ÷ Rpeak76.3 %#45 of 209 · top 21%-
Power draw1,070 kW#40 of 118 · top 33%-

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Atos BullSequana XH2000
Eviden
ATOEPA rolls up to Atos
- Verified atos.nettop500.org
CPU AMD EPYC 7H12 (Rome, high frequency)
CPUs
x86-64 · 64C · 2.6 GHz · 7 nm · 280 W
two AMD Rome 7H12 CPUs with 64 cores each
AMD - Verified docs.csc.fitop500.org
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
Mellanox HDR InfiniBand, dragonfly+
NVIDIA - Verified docs.csc.fitop500.org

Engineering, funding and access

What Mahti runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyInfiniBand HDR100TOP500 list entry2026-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackbullx SCS operating systemTOP500 list entry2026-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
ProcurementAtos BullSequana XH2000 delivered as the second phase of CSC's Atos-built computing and data environment, after Puhti and the 12 PB Allas object store, and planned for deployment in early 2020Atos release republished by HPCwire; Atos said the full environment would give six times the computing capacity of CSC's previous environment.2019-09-23Vendor statedhpcwire.com

The read

CSC's national Atos BullSequana XH2000 with 1,404 nodes of two AMD EPYC 7H12 CPUs and 24 nodes of four NVIDIA A100, on HDR InfiniBand with 8.7 PB of Lustre. Atos says it was installed in August 2020; it was 47th on the June 2020 TOP500. CSC's page quotes a combined 9.5 PFlop/s peak including the GPUs, while TOP500's 7.06 is for the benchmarked CPU run, so the TOP500 figures are the CPU run's. CSC shut Mahti's computing services on 31 August 2026 in favour of Roihu, with login and storage kept to 15 October 2026. The town is not stated in the pages we fetched, so no coordinates are recorded. No A100 memory size is stated, so no GPU part edge is recorded. TOP500 is the only source for Rmax, so the tier is reported.

Timeline

  • 2020-06 Listed at #47 on the TOP500 (June 2020) source
  • 2020-08 First operational source
  • 2026-08 Computing services shut down August 31, replaced by CSC's new Roihu system source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

CSC (Mahti site)

Location
Finland
Commissioned
2020

Change history

Nearby in scale

The machines closest to Mahti by Rmax, smaller to larger.

Same operator

  • Puhti · Finland, decommissioned, 2019
  • LUMI · Finland, upgraded, 2022
  • LUMI-AI · Finland, planned
  • Roihu · Finland, operational, 2026
  • Sisu · Finland, decommissioned, 2012
  • Taito (CSC) · Finland, operational, 2012

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.csc.finames system only-
top500.orgnames system and partNVIDIA InfiniBand HDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading