COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/JURECA

Germany · decommissioned · hpc

JURECA

Also known as JURECA Cluster Module (2015)

Operated by Forschungszentrum Julich at Julich Supercomputing Centre .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.42 PFlop/s
HPL measured
Rpeak
1.69 PFlop/s
Rmax ÷ Rpeak
84.0%
Cores
-
Power
828.55 kW
Per watt
1.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of JURECA, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.42 PFlop/s#68 of 230 · top 29%#51 of 95 · bottom 48%
Energy efficiency1.7 GF/W#110 of 180 · bottom 40%#50 of 68 · bottom 28%
Rmax ÷ Rpeak84.0 %#59 of 226 · top 26%#19 of 94 · top 19%
Power draw829 kW#64 of 182 · top 35%#20 of 69 · top 28%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
T-Platforms V-Class blades
T-Platforms
- Reported top500.orgapps.fz-juelich.de
Accelerator -
NVIDIA K80 GPUs in 75 nodes (two per node)
NVIDIA - Reported apps.fz-juelich.de
CPU -
Two Intel Xeon E5-2680 v3 Haswell 12-core 2.5 GHz CPUs per node
Intel - Reported apps.fz-juelich.de
Interconnect -
Mellanox EDR InfiniBand, non-blocking fat tree
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported apps.fz-juelich.de

Engineering, funding and access

What JURECA runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes1,872 nodesCluster module in 34 racks: 1,872 compute nodes with two 12-core Xeon E5-2680 v3 each, 75 of them with two NVIDIA K80 GPUs, plus 12 visualization nodes with two K40 GPUs, 12 login and 14 service nodes2016-03Operator statedjlsrf.orgapps.fz-juelich.de
Interconnect and topologyMellanox EDR InfiniBand, 100 Gb/s links with ConnectX-4 adapters in a three-level full fat tree; storage reached through InfiniBand-to-Ethernet gateways2016-03Operator statedjlsrf.org

Software

ItemDetailAs ofBasisSource
Parallel filesystemIBM GPFS file systems mounted from the central Julich Storage Cluster (JUST), shared with other JSC systems, at more than 100 GB/s aggregateJSC's configuration page gives a 100 GiB/s connection to JUST2016-03Operator statedjlsrf.orgapps.fz-juelich.de
Job schedulerSlurm with ParaStation resource management2016-03Operator statedjlsrf.org
Programming and software stackCentOS 7 Linux with the ParTec ParaStation ClusterSuite for provisioning and health monitoring2016-03Operator statedjlsrf.org
Programming and software stackIntel MPI and ParTec ParaStation MPI plus CUDA-aware MVAPICH2-GDR; OpenMP, CUDA, OpenCL and OpenACC programming models; UNICORE job submission and LLview monitoring2016-03Operator statedjlsrf.org

Funding

ItemDetailAs ofBasisSource
Funded byHelmholtz AssociationThe 2018 article says Helmholtz funding covered both the Cluster and the 2017 Booster module2016-03Operator statedjlsrf.orgjlsrf.org
Funding programmeHelmholtz Association programme Supercomputing & Big Data2016-03Operator statedjlsrf.orgjlsrf.org
ProcurementDesigned by JSC with T-Platforms, which won a competitive procurement initiated in 2014, and software partner ParTec; in operation as JUROPA's successor from July 20152016-03Operator statedjlsrf.org

Access

ItemDetailAs ofBasisSource
How researchers get timePeer-reviewed compute-time calls published at the end of January and July: a JARA-HPC/VSR call for Forschungszentrum Julich and RWTH Aachen, an NIC call for other German universities and institutes, and preparatory access2016-03Operator statedjlsrf.org

The read

The original 2015 cluster module of Julich's JURECA, built by T-Platforms from V-Class blades: 1,872 nodes of two Xeon E5-2680 v3 12-core CPUs each, 75 of them with two NVIDIA K80 GPUs, on Mellanox EDR InfiniBand, with a 1.8 petaflop CPU peak plus 0.44 petaflop from the GPUs per JSC. TOP500 lists this configuration at 1.42 petaflops Rmax and 1.69 petaflops Rpeak, 50th on the November 2015 list; the later TOP500 entries include the 2017 Booster module and are not recorded here. JSC says the cluster module was retired in 2020 and replaced by JURECA-DC. JSC counts 45,216 CPU cores against TOP500's 49,476, and its peak differs from TOP500's, so no core count is recorded. TOP500 is the only source for Rmax, so the tier is reported.

Timeline

  • 2015 First operational source
  • 2015-11 Listed at #50 on the TOP500 (November 2015) source
  • 2017 A Booster module of Dell PowerEdge C6320P nodes with Intel Xeon Phi 7250-F processors on 100 Gb/s Omni-Path, designed by JSC and Intel and delivered by Intel with Dell EMC, was coupled to the Cluster through 198 router nodes source
  • 2020 Decommissioned source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Julich Supercomputing Centre

Location
Julich, Germany
Cooling
Direct liquid cooling
Commissioned
2004

Change history

Nearby in scale

The machines closest to JURECA by Rmax, smaller to larger.

Same site

Same operator

  • JUGENE · Germany, decommissioned, 2007
  • JEDI · Germany, operational, 2024
  • JETI · Germany, operational, 2024
  • JUBL · Germany, decommissioned, 2006
  • JUPITER · Germany, operational, 2025
  • JUMP · Germany, operational, 2004

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
apps.fz-juelich.denames system only-
top500.orgnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading