COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Discovery (ORNL)

USA · planned · mixed

Discovery (ORNL)

Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray Supercomputing GX5000
Hewlett Packard Enterprise - Reported ornl.gov
Accelerator AMD Instinct MI430X
Accelerators
AMD Instinct MI430X GPUs
AMD - Reported ornl.gov
Storage Intel DAOS
Storage
Object store, no POSIX layer underneath · 230 PB on Aurora · About 31 TB/s
DAOS-based HPE Cray Supercomputing Storage Systems K3000
Hewlett Packard Enterprise - Reported ornl.gov

The read

ORNL's next flagship, announced in October 2025 for delivery in 2028 as an HPE Cray GX5000 with AMD EPYC Venice CPUs and Instinct MI430X GPUs and a DAOS-based HPE storage system. ORNL says only that it will be significantly faster than Frontier, which is not a FLOPS figure. Counts, power and cooling are not published on the page we could fetch, and ORNL is the only source, so the tier is reported.

Timeline

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

None of the cited sources could be read from our network: the hosts returned bot challenges or did not respond. This check says nothing about the citations either way. See how this check works.

Cited sourceResultFound on the page
ornl.govcould not be fetched-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • ORNL, AMD and HPE announce Discovery and Lux as Frontier's AI-era successors · Oak Ridge Leadership Computing Facility
    Lux runs AMD Instinct MI355X on HPE nodes with Oracle Cloud Infrastructure integration and arrives first, in 2026; Discovery follows in 2028 on MI430X and is billed as beating Frontier on every part of the system, not just peak flops. This keeps ORNL's AMD based lineage going a full hardware generation past the MI300A in El Capitan and the MI250X in Frontier.

All news →

Further reading