Also known as SDSC Blue Gene
Operated by SDSC at San Diego Supercomputer Center .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 13.78 TFlop/s
- Rpeak
- 17.20 TFlop/s
- Rmax ÷ Rpeak
- 80.1%
- Cores
- 6,144
- Power
- 67 kW
- Per watt
- 0.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM eServer Blue Gene Solution | IBM | - | Reported | top500.orgsdsc.edu |
| CPU | IBM PowerPC 440 700MHz CPUs PowerPC · 2C · 0.7 GHz · 130 nm · 13 W IBM PowerPC 440 dual-core 700 MHz, two processors per node, 6,144 cores in the expanded configuration | IBM | - | Reported | top500.orgsdsc.edu |
| Interconnect | IBM BlueGene 3D torus Interconnect 3D torus, plus separate collective and barrier networks · 175 MB/s per link per direction 3-D torus for point-to-point messaging plus a global tree for collectives | IBM | - | Reported | sdsc.edu |
| Operating system | IBM Compute Node Kernel Operating systems Microkernel, no dynamic scheduling · Proprietary IBM Blue Gene compute node kernel (CNK) with SLES 9 | IBM | - | Reported | top500.org |
The read
San Diego Supercomputer Center's IBM eServer Blue Gene system, the first Blue Gene at an academic institution. SDSC announced it installed and accepted on 19 December 2004 as a single rack of 1,024 compute nodes and 128 I/O nodes (a 1:8 I/O ratio chosen for data-intensive work), two 700 MHz PowerPC processors per node, 5.7 TFlop/s peak and 512 GB of memory, connected by a 3-D torus and a global tree. TOP500 first listed the 2,048-processor machine in June 2005 at 4.71 TFlop/s Rmax, then listed it expanded to 6,144 cores at 13.78 TFlop/s Rmax, 17.20 TFlop/s Rpeak and 67 kW from November 2006 (42nd) through November 2008 (443rd, its last list). The figures here are for the expanded configuration; the expansion is documented only by TOP500.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-09 Added Intimidata
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| sdsc.edu | names system and part | IBM PowerPC 440 700MHz, IBM Compute Node Kernel |
| top500.org | names system and part | IBM PowerPC 440 700MHz, IBM Compute Node Kernel |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.