COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/LRZ Cerebras CS-2

Germany · operational · ai training

LRZ Cerebras CS-2

Also known as LRZ Cerebras AI system

Operated by LRZ at Leibniz Supercomputing Centre, Garching .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Superdome Flex server paired with the CS-2
Hewlett Packard Enterprise - Reported lrz.delrz.de
Accelerator Cerebras CS-2 (WSE-2)
Accelerators
Cerebras (wafer-scale)
one Cerebras CS-2 system with the 850,000-core WSE-2
Cerebras
1
reported
Reported lrz.delrz.de

The read

A single Cerebras CS-2 with an HPE Superdome Flex host at the Leibniz Supercomputing Centre, announced in May 2022 as the first CS-2 in Europe and funded by the Bavarian Hightech Agenda. LRZ's announcement gives one system, the 850,000-core WSE-2 and water cooling; its December 2022 follow-up says the system was delivered in late summer 2022 and is open to researchers in Bavaria. Both pages are LRZ's own, so the tier is reported; HPE's press release was not retrievable. The Superdome Flex is named but its CPU and memory configuration is not published on the pages fetched.

Timeline

Site & facility

Leibniz Supercomputing Centre, Garching

Location
Garching, Germany
Cooling
Direct warm-water cooling
Commissioned
2006

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
lrz.denames system, part and countCerebras CS-2 (WSE-2) · counts: 1
lrz.denames system, part and countCerebras CS-2 (WSE-2) · counts: 1

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading