Supercomputers/Systems/AFI-NITY
Japan · operational · hpc
AFI-NITY
Also known as Integrated Supercomputation System
Operated by Institute of Fluid Science, Tohoku University at Tohoku IFS Sendai .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.69 PFlop/s
- Rpeak
- 2.70 PFlop/s
- Rmax ÷ Rpeak
- 62.6%
- Cores
- 35,200
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of AFI-NITY, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.69 PFlop/s | #142 of 223 · bottom 37% | #60 of 131 · top 45% |
| Rmax ÷ Rpeak | 62.6 % | #156 of 216 · bottom 29% | #106 of 130 · bottom 20% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Fujitsu PRIMERGY CX2550 M4 | Fujitsu | - | Reported | top500.orgifs.tohoku.ac.jp |
| CPU | Intel Xeon Gold 6148 CPUs x86-64 · 20C · 2.4 GHz · 14 nm · 150 W Intel Xeon Gold 6148 20C 2.4GHz, 35,200 cores | Intel | 1,760 estimated | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR | NVIDIA | - | Reported | top500.orgifs.tohoku.ac.jp |
Engineering, funding and access
What AFI-NITY runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 19 PBExternal storage about 3.4 times that of the previous system; the servers themselves had 192 TB | 2018-08 | Operator stated | ifs.tohoku.ac.jp |
| Interconnect and topology | InfiniBand EDR (TOP500 list entry), with a 40 Gbit Ethernet backbone for users and servers | 2022-06 | Operator stated | top500.orgifs.tohoku.ac.jp |
| Cooling design | Water coolingFujitsu's order announcement says a water cooling model was chosen for energy efficiency | 2017-11 | Vendor stated | info.archives.global.fujitsu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Fujitsu order announced 10 November 2017 for PRIMERGY x86 servers forming two shared memory systems and one distributed memory system, with operation planned for fiscal 2018The order was based on a proposal combining software-based virtualization with a large-scale computational system | 2017-11-10 | Vendor stated | info.archives.global.fujitsu |
The read
AFI-NITY is the Fujitsu PRIMERGY CX2550 M4 part (Xeon Gold 6148 20C 2.4GHz, InfiniBand EDR) of the Institute of Fluid Science Integrated Supercomputation System at Tohoku University, ranked 126th on the November 2018 TOP500 with 35,200 cores, 1.69 PFlop/s Rmax and 2.70 PFlop/s Rpeak and still listed in November 2021 and June 2022 (last at 469th). The institute says the system was updated in August 2018 with Fujitsu PRIMERGY servers for a total peak of 3.7 PFLOPS including the shared-memory vSMP system; Fujitsu's November 2017 order announcement put the planned peak at more than 2.7 petaflops. TOP500 is the only source for the core count and Rmax.
Timeline
- 2017-11-10 Fujitsu announced an order from Tohoku University's Institute of Fluid Science for a PRIMERGY-based system planned to exceed 2.7 petaflops peak source
- 2018-08 First operational source
- 2018-11 Listed at #126 on the TOP500 (November 2018) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-07 Added AFI-NITY, a mid-list TOP500 system (2018-11 126)
Nearby in scale
The machines closest to AFI-NITY by Rmax, smaller to larger.
- SUSTech TaiYi · China, operational · 1.69 PFlop/s
- Prometheus · Poland, decommissioned · 1.67 PFlop/s
- Edison · USA, decommissioned · 1.65 PFlop/s
- Peta4 · United Kingdom, upgraded · 1.7 PFlop/s
- Puhti · Finland, decommissioned · 1.71 PFlop/s
- Tryton Plus · Poland, operational · 1.73 PFlop/s
Related systems
Same site
- AFI-NITY II · Japan, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon Gold 6148, Mellanox InfiniBand EDR |
| ifs.tohoku.ac.jp | names system and part | Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.